AIRLINK 212.82 Increased By ▲ 3.27 (1.56%)
BOP 10.25 Decreased By ▼ -0.21 (-2.01%)
CNERGY 7.00 Decreased By ▼ -0.35 (-4.76%)
FCCL 33.47 Decreased By ▼ -0.92 (-2.68%)
FFL 17.64 Decreased By ▼ -0.41 (-2.27%)
FLYNG 21.82 Decreased By ▼ -1.10 (-4.8%)
HUBC 129.11 Decreased By ▼ -3.38 (-2.55%)
HUMNL 13.86 Decreased By ▼ -0.28 (-1.98%)
KEL 4.86 Decreased By ▼ -0.17 (-3.38%)
KOSM 6.93 Decreased By ▼ -0.14 (-1.98%)
MLCF 43.63 Decreased By ▼ -1.57 (-3.47%)
OGDC 212.95 Decreased By ▼ -5.43 (-2.49%)
PACE 7.22 Decreased By ▼ -0.36 (-4.75%)
PAEL 41.17 Decreased By ▼ -0.53 (-1.27%)
PIAHCLA 16.83 Decreased By ▼ -0.47 (-2.72%)
PIBTL 8.63 Increased By ▲ 0.08 (0.94%)
POWERPS 12.50 No Change ▼ 0.00 (0%)
PPL 183.03 Decreased By ▼ -6.00 (-3.17%)
PRL 39.63 Decreased By ▼ -2.70 (-6.38%)
PTC 24.73 Decreased By ▼ -0.44 (-1.75%)
SEARL 98.01 Decreased By ▼ -5.95 (-5.72%)
SILK 1.01 Decreased By ▼ -0.02 (-1.94%)
SSGC 41.73 Increased By ▲ 2.49 (6.35%)
SYM 18.86 Decreased By ▼ -0.30 (-1.57%)
TELE 9.00 Decreased By ▼ -0.24 (-2.6%)
TPLP 12.40 Decreased By ▼ -0.70 (-5.34%)
TRG 65.68 Decreased By ▼ -3.50 (-5.06%)
WAVESAPP 10.98 Increased By ▲ 0.26 (2.43%)
WTL 1.79 Increased By ▲ 0.08 (4.68%)
YOUW 4.03 Decreased By ▼ -0.11 (-2.66%)
BR100 11,866 Decreased By -213.1 (-1.76%)
BR30 35,697 Decreased By -905.3 (-2.47%)
KSE100 114,148 Decreased By -1904.2 (-1.64%)
KSE30 35,952 Decreased By -625.5 (-1.71%)

The Central Development Working Party (CDWP) will meet on Monday (February 8) to discuss 20 development projects with an estimated cost of Rs 92.96 billion, it is learnt. According to sources, the CDWP would discuss as many as 6 development projects of transport and communication, 3 development projects of water resources, 2 projects of physical planning and housing, 5 projects of Higher Education Commission and one project each of energy, science and technology, environment and governance.
According to the agenda of the CDWP meeting, 5 development projects of Transport and Communication: (i) Procurement of 58 Diesel Electric Locomotives (revised) of Rs 16.3 billion, (ii) Infrastructure Development of Gwadar Industrial Estate Development Authority (500 acres), Rs 1.73 billion, (iii) Improvement and Widening of Jaglot-Skardu road (S-1), Rs 39.74 billion, (iv) Upgradation of Terminal Facilities at Dry Ports , 1.02 billion, (v) Construction of Fish Landing Jetty and allied Harbour Works at Pishukan-East Bay Gwadar Rs 1869.3 million and Construction of Fish Landing Jetty and allied Harbour Works at Surbandar-East Gwadar at an estimated cost of Rs 1650.342 million.
About the development projects of Ministry of Water and Power, the meeting is scheduled to discuss Lower Indus Right Bank Irrigation and Drainage Project (LIRBP) (Stage-1) of Rs 17.51 billion, feasibility study of Akhori Dam Project, Rs 286.85 million and construction of Palai/Sanam Dam Project in multiple districts of Khyber Pakhtunkhawa, Rs 944.67 million.
Development projects of Higher Education Commission including development of the University of Balochistan, Quetta of Rs 1.1 billion, Strengthening and Enhancement of Academic Provision in Faculty of Life and Environmental Sciences, Rs 547.22 million, Prime Minister's Merit Scholarships for top position holders enrolled at Pakistani Universities, Rs 5.43 billion, Establishment of Upgrading of Core Engineering Department in Mardan Campus of UET Peshawar, Rs 1.38 billion and Strengthening of Academic and Research Program of Mehran University of Engineering and Technology Jamshoro of Rs 927.15 million.
The CDWP would discuss two projects of Physical Planning and Housing including Construction of Complex for National Highway and Motorway Police at Rahim Yar Khan of Rs 167.22 million and Construction of Residential and Non Residential Building for Force HQ GB Scouts and 112 Wing at Skardu.
The meeting would discuss the following projects: (i) Rehabilitation of NTDC system in South Area for improvement in system reliability to avoid the frequent tripping at a cost of Rs 1.06 billion, (ii) Capacity building in design assessment & analysis to ensure safety of Nuclear Power Plants (NPPs) in Pakistan at a cost of Rs 296.9 million; (iii) Carbon Neutral Pakistan at a cost of Rs 313.96 million; (iv) Environment, establishment of Special Project Cell (SPC) in the Planning Commission at a cost of Rs 72.37 million; and (v) Establishment of Cardiac Care Center at AIMS, Muzaffarabad at an estimated cost Rs 393.24 million.

Copyright Business Recorder, 2016

Comments

Comments are closed.