AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 132.66 Increased By ▲ 3.13 (2.42%)
BOP 6.89 Increased By ▲ 0.21 (3.14%)
CNERGY 4.57 Decreased By ▼ -0.06 (-1.3%)
DCL 8.92 Decreased By ▼ -0.02 (-0.22%)
DFML 42.75 Increased By ▲ 1.06 (2.54%)
DGKC 84.00 Increased By ▲ 0.23 (0.27%)
FCCL 32.90 Increased By ▲ 0.13 (0.4%)
FFBL 77.06 Increased By ▲ 1.59 (2.11%)
FFL 12.20 Increased By ▲ 0.73 (6.36%)
HUBC 110.01 Decreased By ▼ -0.54 (-0.49%)
HUMNL 14.40 Decreased By ▼ -0.16 (-1.1%)
KEL 5.53 Increased By ▲ 0.14 (2.6%)
KOSM 8.32 Decreased By ▼ -0.08 (-0.95%)
MLCF 39.67 Decreased By ▼ -0.12 (-0.3%)
NBP 65.50 Increased By ▲ 5.21 (8.64%)
OGDC 198.74 Decreased By ▼ -0.92 (-0.46%)
PAEL 26.00 Decreased By ▼ -0.65 (-2.44%)
PIBTL 7.62 Decreased By ▼ -0.04 (-0.52%)
PPL 159.00 Increased By ▲ 1.08 (0.68%)
PRL 26.24 Decreased By ▼ -0.49 (-1.83%)
PTC 18.35 Decreased By ▼ -0.11 (-0.6%)
SEARL 82.24 Decreased By ▼ -0.20 (-0.24%)
TELE 8.12 Decreased By ▼ -0.19 (-2.29%)
TOMCL 34.40 Decreased By ▼ -0.11 (-0.32%)
TPLP 8.98 Decreased By ▼ -0.08 (-0.88%)
TREET 16.88 Decreased By ▼ -0.59 (-3.38%)
TRG 59.49 Decreased By ▼ -1.83 (-2.98%)
UNITY 27.52 Increased By ▲ 0.09 (0.33%)
WTL 1.40 Increased By ▲ 0.02 (1.45%)
BR100 10,614 Increased By 206.9 (1.99%)
BR30 31,874 Increased By 160.5 (0.51%)
KSE100 98,972 Increased By 1644 (1.69%)
KSE30 30,784 Increased By 591.7 (1.96%)

K-Electric continues its effort to educate the young leaders of tomorrow and hosted Bahria University Karachi's students at one of their power plants located in Korangi. These students and faculty members visited Korangi's Combined Cycle Power Plant (CCPP 220 MW) which was part of a knowledge sharing platform engaging these young engineering students.
According to K-Electric's press statement the purpose of the visit was to help out students of the Electrical Engineering Department to have a better understanding of the practical aspect of the theory that they studied during their curriculum. KE spokesperson added "The students were given a brief about safety induction and history of the Korangi Combined Cycle Power Plant. This was followed by visits to various electrical installations, control room and monitoring areas and we as a responsible corporate entity believe that we have to give back to our society which is part of our work ethic".
The faculty members appreciated the time and effort that KE was putting in for the benefit of students. The faculty members also showed interest in initiating a long-term collaboration with K-Electric in order to better facilitate their passing out engineering graduates.-PR

Copyright Business Recorder, 2016

Comments

Comments are closed.