AIRLINK 196.25 Increased By ▲ 4.41 (2.3%)
BOP 10.16 Increased By ▲ 0.29 (2.94%)
CNERGY 7.88 Increased By ▲ 0.21 (2.74%)
FCCL 38.30 Increased By ▲ 0.44 (1.16%)
FFL 15.90 Increased By ▲ 0.14 (0.89%)
FLYNG 25.40 Increased By ▲ 0.09 (0.36%)
HUBC 130.65 Increased By ▲ 0.48 (0.37%)
HUMNL 13.76 Increased By ▲ 0.17 (1.25%)
KEL 4.67 No Change ▼ 0.00 (0%)
KOSM 6.39 Increased By ▲ 0.18 (2.9%)
MLCF 44.90 Increased By ▲ 0.61 (1.38%)
OGDC 209.50 Increased By ▲ 2.63 (1.27%)
PACE 6.68 Increased By ▲ 0.12 (1.83%)
PAEL 41.05 Increased By ▲ 0.50 (1.23%)
PIAHCLA 17.74 Increased By ▲ 0.15 (0.85%)
PIBTL 8.13 Increased By ▲ 0.06 (0.74%)
POWER 9.39 Increased By ▲ 0.15 (1.62%)
PPL 180.85 Increased By ▲ 2.29 (1.28%)
PRL 39.96 Increased By ▲ 0.88 (2.25%)
PTC 24.41 Increased By ▲ 0.27 (1.12%)
SEARL 111.67 Increased By ▲ 3.82 (3.54%)
SILK 0.99 Increased By ▲ 0.02 (2.06%)
SSGC 38.17 Decreased By ▼ -0.94 (-2.4%)
SYM 19.25 Increased By ▲ 0.13 (0.68%)
TELE 8.73 Increased By ▲ 0.13 (1.51%)
TPLP 12.15 Decreased By ▼ -0.22 (-1.78%)
TRG 65.99 Decreased By ▼ -0.02 (-0.03%)
WAVESAPP 12.27 Decreased By ▼ -0.51 (-3.99%)
WTL 1.68 Decreased By ▼ -0.02 (-1.18%)
YOUW 3.99 Increased By ▲ 0.04 (1.01%)
BR100 12,095 Increased By 164.4 (1.38%)
BR30 35,995 Increased By 335.4 (0.94%)
KSE100 114,879 Increased By 1673 (1.48%)
KSE30 36,108 Increased By 542.8 (1.53%)

The Executive Board of National Highway Authority (NHA) has approved the construction of flyover at Shaheen Chowk on Gujrat Bypass (N-5) in district Gujrat. The decision was taken in the meeting at NHA HQ on Friday. Chairman NHA Shahid Ashraf Tarar presided over the meeting.
The meeting was informed that Shaheen Chowk is one of the most congested points on GT Road (N-5) as the entire traffic from Lahore and Sargodha to Rawalpindi (and vice versa) as well as normal traffic of N-5 converge here. This is causing disarrayed traffic movement with reduced safety. The construction of a flyover would, therefore, greatly help in smoothing the flow of traffic at this particular place.
The scope of work includes construction of bridge, ramps, service road and rehabilitation of existing road. The project is being financed through Government of Pakistan funds and was awarded to M/s SARCO, the lowest evaluated responsive bidder at a bid price of Rs 82.04 million, which is 9.61 percent below the engineer's estimate, thus resulting in a considerable amount as saving to the national exchequer.-PR

Copyright Business Recorder, 2016

Comments

Comments are closed.