AGL 34.80 Decreased By ▼ -0.40 (-1.14%)
AIRLINK 127.22 Increased By ▲ 3.99 (3.24%)
BOP 5.16 Increased By ▲ 0.12 (2.38%)
CNERGY 3.85 Decreased By ▼ -0.06 (-1.53%)
DCL 8.04 Decreased By ▼ -0.11 (-1.35%)
DFML 45.29 Increased By ▲ 1.07 (2.42%)
DGKC 75.30 Increased By ▲ 0.95 (1.28%)
FCCL 24.75 Increased By ▲ 0.28 (1.14%)
FFBL 43.70 Decreased By ▼ -4.50 (-9.34%)
FFL 8.85 Increased By ▲ 0.07 (0.8%)
HUBC 141.99 Decreased By ▼ -3.86 (-2.65%)
HUMNL 10.55 Decreased By ▼ -0.30 (-2.76%)
KEL 3.95 Decreased By ▼ -0.05 (-1.25%)
KOSM 7.85 Decreased By ▼ -0.15 (-1.88%)
MLCF 32.93 Increased By ▲ 0.13 (0.4%)
NBP 56.74 Decreased By ▼ -0.41 (-0.72%)
OGDC 141.35 Decreased By ▼ -4.00 (-2.75%)
PAEL 25.60 Decreased By ▼ -0.15 (-0.58%)
PIBTL 5.79 Increased By ▲ 0.03 (0.52%)
PPL 112.00 Decreased By ▼ -4.80 (-4.11%)
PRL 23.98 Decreased By ▼ -0.02 (-0.08%)
PTC 11.13 Increased By ▲ 0.08 (0.72%)
SEARL 58.35 Decreased By ▼ -0.06 (-0.1%)
TELE 7.49 No Change ▼ 0.00 (0%)
TOMCL 41.15 Increased By ▲ 0.05 (0.12%)
TPLP 8.49 Increased By ▲ 0.18 (2.17%)
TREET 15.01 Decreased By ▼ -0.19 (-1.25%)
TRG 57.11 Increased By ▲ 1.91 (3.46%)
UNITY 27.63 Decreased By ▼ -0.22 (-0.79%)
WTL 1.31 Decreased By ▼ -0.03 (-2.24%)
BR100 8,566 Decreased By -6.2 (-0.07%)
BR30 26,766 Decreased By -509.5 (-1.87%)
KSE100 81,607 Increased By 147.6 (0.18%)
KSE30 25,823 Increased By 22.8 (0.09%)

Asian Development Bank (ADB) will extend soft loan to Khyber Pakhtunkhwa government for construction and rehabilitation of all highways in the province on international standards. Initially the Bank will provide $150 million (Rs 30 billion) for the reconstruction of provincial highways up to 300 Kilometres, while it will later be expanded up to $250 million upon successful and satisfactory execution of the 1st phase.
Basic facilities for travellers will also be arranged alongside these highways to make the journey comfortable to the maximum extent. Meanwhile, a MoU was agreed upon between the ADB and KP Government during a meeting of the high level delegation of the Bank with Akbar Ayub Khan, Advisor to Chief Minister on Communication and Works at C&W Secretariat Peshawar.
The delegation was led by Jaingbo Ning while the country officer Pawan Karkprn also accompanied him. Secretary C&W Engr Muhammad Asif Khan, MD Pakhtunkhwa Highway Authority Engr Uzair Khan, Director Engineering Ejaz Khan, consultant and other representatives were also present on this occasion.
Managing Director (MD) PHA gave a detailed briefing to the ADB officials and highlighted the road networks and its condition as well as responded to the queries of the delegates. The ADB team assured that the required loan would be provided to the KP Government as soon as possible to enable the provincial government to rehabilitate its road infrastructure with seismic and GPS supports.
It further assured that the financial and technical assistance would be further extended on improved performance of the engineering team of the provincial government. It, however, eulogized excellent engineering works of the C&W Department. Akbar Ayub thanked the ADB team for providing generous financial support to the provincial government for improving its roads and highways and expressed the confidence that it would continue the KP government to bring its infrastructure at par with international standards to work shoulder to shoulder with global community in all walks of life.

Copyright Business Recorder, 2016

Comments

Comments are closed.