AGL 37.99 Decreased By ▼ -0.03 (-0.08%)
AIRLINK 215.53 Increased By ▲ 18.17 (9.21%)
BOP 9.80 Increased By ▲ 0.26 (2.73%)
CNERGY 6.79 Increased By ▲ 0.88 (14.89%)
DCL 9.17 Increased By ▲ 0.35 (3.97%)
DFML 38.96 Increased By ▲ 3.22 (9.01%)
DGKC 100.25 Increased By ▲ 3.39 (3.5%)
FCCL 36.70 Increased By ▲ 1.45 (4.11%)
FFBL 88.94 No Change ▼ 0.00 (0%)
FFL 14.49 Increased By ▲ 1.32 (10.02%)
HUBC 134.13 Increased By ▲ 6.58 (5.16%)
HUMNL 13.63 Increased By ▲ 0.13 (0.96%)
KEL 5.69 Increased By ▲ 0.37 (6.95%)
KOSM 7.32 Increased By ▲ 0.32 (4.57%)
MLCF 45.87 Increased By ▲ 1.17 (2.62%)
NBP 61.28 Decreased By ▼ -0.14 (-0.23%)
OGDC 232.59 Increased By ▲ 17.92 (8.35%)
PAEL 40.73 Increased By ▲ 1.94 (5%)
PIBTL 8.58 Increased By ▲ 0.33 (4%)
PPL 203.34 Increased By ▲ 10.26 (5.31%)
PRL 40.81 Increased By ▲ 2.15 (5.56%)
PTC 28.31 Increased By ▲ 2.51 (9.73%)
SEARL 108.51 Increased By ▲ 4.91 (4.74%)
TELE 8.74 Increased By ▲ 0.44 (5.3%)
TOMCL 35.83 Increased By ▲ 0.83 (2.37%)
TPLP 13.84 Increased By ▲ 0.54 (4.06%)
TREET 24.38 Increased By ▲ 2.22 (10.02%)
TRG 61.15 Increased By ▲ 5.56 (10%)
UNITY 34.84 Increased By ▲ 1.87 (5.67%)
WTL 1.72 Increased By ▲ 0.12 (7.5%)
BR100 12,244 Increased By 517.6 (4.41%)
BR30 38,419 Increased By 2042.6 (5.62%)
KSE100 113,924 Increased By 4411.3 (4.03%)
KSE30 36,044 Increased By 1530.5 (4.43%)

The Association of Builders and Developers (ABAD) Punjab Chairman, Engr Akber Sheikh has urged the Punjab government to address the concerns relating to Orange Line Metro Train for timely completion of the project. According to him, the NESPAK reports regarding structural integrity of construction and its impact on existing structures should be acceptable at any forum as it is an international consultancy.
"With the availability of 15 archeological sites on a stretch of 15 kilometer at the Orange Line Metro Train project, the route will look like an archeological safari and it will promote urban tourism in Lahore," he said in a statement issued on Tuesday. He said the Shalamar Garden is the only historical site listed with the international heritage of UNESCO where a visual impact assessment was required.
In his opinion, the elevated metro track will improve visibility of the garden and will enhance its visual impact. It will also increase visitors to the archeological site, he hoped. Regarding the underground/elevated track controversy, he said the underground construction would be three times expensive than the elevated track. Furthermore, this type of construction is possible only where existing structures are laid out in regular rectangular pattern, he added.
"In all the temperate climate countries like Dubai, Kuala Lumpur and Delhi, elevated or hybrids are used for construction purposes." He said maintenance of the underground tracks and stations is always difficult, especially in a highly threatening security situation.

Copyright Business Recorder, 2016

Comments

Comments are closed.