AGL 40.21 Increased By ▲ 0.18 (0.45%)
AIRLINK 127.64 Decreased By ▼ -0.06 (-0.05%)
BOP 6.67 Increased By ▲ 0.06 (0.91%)
CNERGY 4.45 Decreased By ▼ -0.15 (-3.26%)
DCL 8.73 Decreased By ▼ -0.06 (-0.68%)
DFML 41.16 Decreased By ▼ -0.42 (-1.01%)
DGKC 86.11 Increased By ▲ 0.32 (0.37%)
FCCL 32.56 Increased By ▲ 0.07 (0.22%)
FFBL 64.38 Increased By ▲ 0.35 (0.55%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 112.46 Increased By ▲ 1.69 (1.53%)
HUMNL 14.81 Decreased By ▼ -0.26 (-1.73%)
KEL 5.04 Increased By ▲ 0.16 (3.28%)
KOSM 7.36 Decreased By ▼ -0.09 (-1.21%)
MLCF 40.33 Decreased By ▼ -0.19 (-0.47%)
NBP 61.08 Increased By ▲ 0.03 (0.05%)
OGDC 194.18 Decreased By ▼ -0.69 (-0.35%)
PAEL 26.91 Decreased By ▼ -0.60 (-2.18%)
PIBTL 7.28 Decreased By ▼ -0.53 (-6.79%)
PPL 152.68 Increased By ▲ 0.15 (0.1%)
PRL 26.22 Decreased By ▼ -0.36 (-1.35%)
PTC 16.14 Decreased By ▼ -0.12 (-0.74%)
SEARL 85.70 Increased By ▲ 1.56 (1.85%)
TELE 7.67 Decreased By ▼ -0.29 (-3.64%)
TOMCL 36.47 Decreased By ▼ -0.13 (-0.36%)
TPLP 8.79 Increased By ▲ 0.13 (1.5%)
TREET 16.84 Decreased By ▼ -0.82 (-4.64%)
TRG 62.74 Increased By ▲ 4.12 (7.03%)
UNITY 28.20 Increased By ▲ 1.34 (4.99%)
WTL 1.34 Decreased By ▼ -0.04 (-2.9%)
BR100 10,086 Increased By 85.5 (0.85%)
BR30 31,170 Increased By 168.1 (0.54%)
KSE100 94,764 Increased By 571.8 (0.61%)
KSE30 29,410 Increased By 209 (0.72%)

The 720 megawatt Karot Hydropower Project being built from Silk Road Fund initiated by Chinese President, Xi Jinping, would become operational by the year 2020. The construction work on this project has already been started at Karot village of Rawalpindi district in January this year and is expected to be completed in 2020, a senior official in the Ministry of Planning, Development and Reforms said.
He said, it is the first hydropower project financed by China's Silk Road Project for which land acquisition is being completed at a fast pace. After completion in 5 years, the Karot Power Company will run and maintain the project for 30 years after which it will be transferred to the Punjab government. The Project site is accessible through the road from Islamabad-Kahuta-Kotli Road approximately 29 kilometres from Kahuta village, and 65 kilometres from Islamabad. The major project features included construction of concrete gravity 91 meters high dam with a crest length of 320 meters near the village of Gohra.
The dam's reservoir will be approximately 152 million cubic meters in volume, with a length of 27 kilometres. However 72 homes and 58 businesses are expected to require relocation as a result of construction, while 2.8 kilometres of the Karot-Kotli road, and 8.9 kilometres of the Azad Pattan-Kahuta road will need relocation. The power intake structure will be constructed on right bank of the river immediately upstream of Dam site and will divert the water into headrace tunnels entering into Cavern Powerhouse. The water will be discharged back to River Jhelum through tail-race channel located at right bank of the River Jhelum immediately downstream of Karot village. The dam will generate mean annual energy 3,436 GWh, and will connect to Pakistan's national electricity grid.

Copyright Associated Press of Pakistan, 2016

Comments

Comments are closed.