AIRLINK 180.36 Increased By ▲ 6.57 (3.78%)
BOP 11.17 Decreased By ▼ -0.19 (-1.67%)
CNERGY 8.53 Decreased By ▼ -0.11 (-1.27%)
CPHL 100.41 Decreased By ▼ -1.23 (-1.21%)
FCCL 45.96 Decreased By ▼ -0.98 (-2.09%)
FFL 15.81 Increased By ▲ 0.42 (2.73%)
FLYNG 27.89 Increased By ▲ 0.10 (0.36%)
HUBC 142.47 Decreased By ▼ -1.28 (-0.89%)
HUMNL 13.01 Increased By ▲ 0.02 (0.15%)
KEL 4.52 No Change ▼ 0.00 (0%)
KOSM 5.84 Increased By ▲ 0.08 (1.39%)
MLCF 61.90 Decreased By ▼ -0.43 (-0.69%)
OGDC 214.32 Increased By ▲ 2.30 (1.08%)
PACE 5.92 Increased By ▲ 0.45 (8.23%)
PAEL 46.83 Decreased By ▼ -0.24 (-0.51%)
PIAHCLA 17.84 Decreased By ▼ -0.24 (-1.33%)
PIBTL 10.62 Decreased By ▼ -0.24 (-2.21%)
POWER 12.17 Decreased By ▼ -0.09 (-0.73%)
PPL 172.71 Increased By ▲ 1.43 (0.83%)
PRL 36.02 Increased By ▲ 0.14 (0.39%)
PTC 23.26 Decreased By ▼ -0.10 (-0.43%)
SEARL 96.06 Decreased By ▼ -0.90 (-0.93%)
SSGC 41.34 Decreased By ▼ -0.37 (-0.89%)
SYM 14.44 Increased By ▲ 0.29 (2.05%)
TELE 7.38 Increased By ▲ 0.28 (3.94%)
TPLP 10.08 Increased By ▲ 0.12 (1.2%)
TRG 67.90 Increased By ▲ 4.01 (6.28%)
WAVESAPP 10.00 Decreased By ▼ -0.02 (-0.2%)
WTL 1.34 Increased By ▲ 0.01 (0.75%)
YOUW 3.81 Increased By ▲ 0.09 (2.42%)
BR100 12,481 Increased By 33.6 (0.27%)
BR30 38,008 Increased By 88.3 (0.23%)
KSE100 116,776 Increased By 385.5 (0.33%)
KSE30 35,849 Increased By 153 (0.43%)

The Bhikki power plant located in Sheikhupura started generating energy on trial basis, the government said on Tuesday. Water and Power Ministry in a statement has said that the Liquefied Natural Gas (LNG) based power plant is capable of generating electricity of upto 1200 megawatts.
The government of Pakistan Muslim League-Nawaz (PML-N) is trying to overcome the crippling energy crisis in the country that has hit hard the national economy. Prime Minister Nawaz Sharif has announced to get rid of the power loadshedding in Pakistan by year 2018.
The LNG-based Bhikki power project will save Rs 175 billion to the national exchequer, the government sources claimed. The project will add 750 megawatt of power by March 2017 and will reach to its full capacity of 1200 megawatt by December 2017. The power ministry has also stated that the work on transmission lines along with power plants is ongoing at a rapid pace.

Copyright News Network International, 2016

Comments

Comments are closed.