AIRLINK 173.68 Decreased By ▼ -2.21 (-1.26%)
BOP 10.82 Decreased By ▼ -0.16 (-1.46%)
CNERGY 8.26 Increased By ▲ 0.26 (3.25%)
FCCL 46.41 Increased By ▲ 0.29 (0.63%)
FFL 16.14 Increased By ▲ 0.07 (0.44%)
FLYNG 27.80 Increased By ▲ 0.38 (1.39%)
HUBC 146.32 Increased By ▲ 2.36 (1.64%)
HUMNL 13.40 Increased By ▲ 0.05 (0.37%)
KEL 4.39 Decreased By ▼ -0.11 (-2.44%)
KOSM 5.93 Decreased By ▼ -0.05 (-0.84%)
MLCF 59.66 Increased By ▲ 0.16 (0.27%)
OGDC 232.73 Decreased By ▼ -0.02 (-0.01%)
PACE 5.80 Decreased By ▼ -0.08 (-1.36%)
PAEL 47.98 Increased By ▲ 0.50 (1.05%)
PIAHCLA 17.75 Decreased By ▼ -0.22 (-1.22%)
PIBTL 10.40 Decreased By ▼ -0.18 (-1.7%)
POWER 11.32 Decreased By ▼ -0.06 (-0.53%)
PPL 191.48 Decreased By ▼ -1.82 (-0.94%)
PRL 36.83 Decreased By ▼ -0.17 (-0.46%)
PTC 23.20 Decreased By ▼ -0.57 (-2.4%)
SEARL 98.76 Decreased By ▼ -1.11 (-1.11%)
SILK 1.15 No Change ▼ 0.00 (0%)
SSGC 36.62 Decreased By ▼ -0.57 (-1.53%)
SYM 14.70 Decreased By ▼ -0.25 (-1.67%)
TELE 7.73 Decreased By ▼ -0.02 (-0.26%)
TPLP 10.75 Decreased By ▼ -0.12 (-1.1%)
TRG 66.01 Increased By ▲ 0.87 (1.34%)
WAVESAPP 10.82 Decreased By ▼ -0.09 (-0.82%)
WTL 1.32 Decreased By ▼ -0.02 (-1.49%)
YOUW 3.79 Decreased By ▼ -0.02 (-0.52%)
BR100 12,644 Increased By 35.1 (0.28%)
BR30 39,387 Increased By 124.3 (0.32%)
KSE100 117,807 Increased By 34.4 (0.03%)
KSE30 36,347 Increased By 50.4 (0.14%)

The Bhikki power plant located in Sheikhupura started generating energy on trial basis, the government said on Tuesday. Water and Power Ministry in a statement has said that the Liquefied Natural Gas (LNG) based power plant is capable of generating electricity of upto 1200 megawatts.
The government of Pakistan Muslim League-Nawaz (PML-N) is trying to overcome the crippling energy crisis in the country that has hit hard the national economy. Prime Minister Nawaz Sharif has announced to get rid of the power loadshedding in Pakistan by year 2018.
The LNG-based Bhikki power project will save Rs 175 billion to the national exchequer, the government sources claimed. The project will add 750 megawatt of power by March 2017 and will reach to its full capacity of 1200 megawatt by December 2017. The power ministry has also stated that the work on transmission lines along with power plants is ongoing at a rapid pace.

Copyright News Network International, 2016

Comments

Comments are closed.