AGL 36.51 Decreased By ▼ -1.49 (-3.92%)
AIRLINK 216.01 Increased By ▲ 2.10 (0.98%)
BOP 9.46 Increased By ▲ 0.04 (0.42%)
CNERGY 6.59 Increased By ▲ 0.30 (4.77%)
DCL 8.50 Decreased By ▼ -0.27 (-3.08%)
DFML 40.90 Decreased By ▼ -1.31 (-3.1%)
DGKC 99.48 Increased By ▲ 5.36 (5.69%)
FCCL 36.48 Increased By ▲ 1.29 (3.67%)
FFBL 88.94 No Change ▼ 0.00 (0%)
FFL 17.17 Increased By ▲ 0.78 (4.76%)
HUBC 126.25 Decreased By ▼ -0.65 (-0.51%)
HUMNL 13.35 Decreased By ▼ -0.02 (-0.15%)
KEL 5.24 Decreased By ▼ -0.07 (-1.32%)
KOSM 6.71 Decreased By ▼ -0.23 (-3.31%)
MLCF 44.24 Increased By ▲ 1.26 (2.93%)
NBP 60.50 Increased By ▲ 1.65 (2.8%)
OGDC 222.49 Increased By ▲ 3.07 (1.4%)
PAEL 40.60 Increased By ▲ 1.44 (3.68%)
PIBTL 8.16 Decreased By ▼ -0.02 (-0.24%)
PPL 191.99 Increased By ▲ 0.33 (0.17%)
PRL 38.60 Increased By ▲ 0.68 (1.79%)
PTC 27.00 Increased By ▲ 0.66 (2.51%)
SEARL 103.50 Decreased By ▼ -0.50 (-0.48%)
TELE 8.62 Increased By ▲ 0.23 (2.74%)
TOMCL 34.86 Increased By ▲ 0.11 (0.32%)
TPLP 13.60 Increased By ▲ 0.72 (5.59%)
TREET 24.99 Decreased By ▼ -0.35 (-1.38%)
TRG 71.99 Increased By ▲ 1.54 (2.19%)
UNITY 33.33 Decreased By ▼ -0.06 (-0.18%)
WTL 1.72 No Change ▼ 0.00 (0%)
BR100 11,987 Increased By 93.1 (0.78%)
BR30 37,178 Increased By 323.2 (0.88%)
KSE100 111,351 Increased By 927.9 (0.84%)
KSE30 35,039 Increased By 261 (0.75%)

Pakistan's fourth nuclear power plant went online Wednesday, a joint collaboration with China that adds 340 megawatts to the national grid as part of the goverment's efforts to end a growth-sapping energy deficit. Pakistan seeks to close an electricity shortfall that can stretch up to 7,000 MW in peak summer months, or around 32 percent of total demand.
The Chashma-III reactor, located some 250 kilometres (155 miles) south-west of capital Islamabad, is the third built as part of a collaboration between the Pakistan Atomic Energy Commission (PAEC) and China National Nuclear Corporation (CNNC). The country's first nuclear plant was supplied by Canada in 1972, with an installed capacity of 137 MW.
"Today we have crossed an important milestone in the journey to free the nation from scheduled power cuts. I am thankful to Allah and congratulate the entire nation," Prime Minister Nawaz Sharif told an inaugural ceremony attended by Chinese and Pakistani officials. He added a fourth Chashma plant was expected to be commissioned by April 2017. Two more reactors would follow at an unspecified date in central Pakistan, as well as two giant 2,200 MW power stations in Karachi. Islamabad is aiming to produce 8,800 MW from atomic energy by 2030.
Pakistan has been struggling to provide enough power to its nearly 200 million citizens for years, and Sharif has vowed to solve the crisis by 2018. The energy sector has traditionally struggled to cover the cost of producing electricity, leading the government to divert $2 billion annually as a subsidy, according to a recent report commissioned by the British government.
China meanwhile is ramping up investment in its South Asian neighbour as part of a $46 billion project unveiled last year that will link its far-western Xinjiang region to Pakistan's Gwadar port with a series of infrastructure, power and transport upgrades. Last week Pakistan's main bourse announced that a Chinese consortium was set to acquire a 40 percent stake in the stock exchange in a deal estimated at $84 million. Shanghai Electric announced in August it would buy a majority stake in the utility that supplies energy to Karachi for $1.7 billion, in the country's biggest ever private-sector acquisition.

Copyright Agence France-Presse, 2016

Comments

Comments are closed.