AGL 40.02 Decreased By ▼ -0.01 (-0.02%)
AIRLINK 127.99 Increased By ▲ 0.29 (0.23%)
BOP 6.66 Increased By ▲ 0.05 (0.76%)
CNERGY 4.44 Decreased By ▼ -0.16 (-3.48%)
DCL 8.75 Decreased By ▼ -0.04 (-0.46%)
DFML 41.24 Decreased By ▼ -0.34 (-0.82%)
DGKC 86.18 Increased By ▲ 0.39 (0.45%)
FCCL 32.40 Decreased By ▼ -0.09 (-0.28%)
FFBL 64.89 Increased By ▲ 0.86 (1.34%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 112.51 Increased By ▲ 1.74 (1.57%)
HUMNL 14.75 Decreased By ▼ -0.32 (-2.12%)
KEL 5.08 Increased By ▲ 0.20 (4.1%)
KOSM 7.38 Decreased By ▼ -0.07 (-0.94%)
MLCF 40.44 Decreased By ▼ -0.08 (-0.2%)
NBP 61.00 Decreased By ▼ -0.05 (-0.08%)
OGDC 193.60 Decreased By ▼ -1.27 (-0.65%)
PAEL 26.88 Decreased By ▼ -0.63 (-2.29%)
PIBTL 7.31 Decreased By ▼ -0.50 (-6.4%)
PPL 152.25 Decreased By ▼ -0.28 (-0.18%)
PRL 26.20 Decreased By ▼ -0.38 (-1.43%)
PTC 16.11 Decreased By ▼ -0.15 (-0.92%)
SEARL 85.50 Increased By ▲ 1.36 (1.62%)
TELE 7.70 Decreased By ▼ -0.26 (-3.27%)
TOMCL 36.95 Increased By ▲ 0.35 (0.96%)
TPLP 8.77 Increased By ▲ 0.11 (1.27%)
TREET 16.80 Decreased By ▼ -0.86 (-4.87%)
TRG 62.20 Increased By ▲ 3.58 (6.11%)
UNITY 28.07 Increased By ▲ 1.21 (4.5%)
WTL 1.32 Decreased By ▼ -0.06 (-4.35%)
BR100 10,081 Increased By 80.6 (0.81%)
BR30 31,142 Increased By 139.8 (0.45%)
KSE100 94,764 Increased By 571.8 (0.61%)
KSE30 29,410 Increased By 209 (0.72%)

Pakistan''s fourth nuclear power plant went online Wednesday, a joint collaboration with China that adds 340 megawatts to the national grid as part of the goverment''s efforts to end a growth-sapping energy deficit. Pakistan seeks to close an electricity shortfall that can stretch up to 7,000 MW in peak summer months, or around 32 percent of total demand.
The Chashma-III reactor, located some 250 kilometres (155 miles) south-west of capital Islamabad, is the third built as part of a collaboration between the Pakistan Atomic Energy Commission (PAEC) and China National Nuclear Corporation (CNNC). The country''s first nuclear plant was supplied by Canada in 1972, with an installed capacity of 137 MW.
"Today we have crossed an important milestone in the journey to free the nation from scheduled power cuts. I am thankful to Allah and congratulate the entire nation," Prime Minister Nawaz Sharif told an inaugural ceremony attended by Chinese and Pakistani officials. He added a fourth Chashma plant was expected to be commissioned by April 2017. Two more reactors would follow at an unspecified date in central Pakistan, as well as two giant 2,200 MW power stations in Karachi. Islamabad is aiming to produce 8,800 MW from atomic energy by 2030.
Pakistan has been struggling to provide enough power to its nearly 200 million citizens for years, and Sharif has vowed to solve the crisis by 2018. The energy sector has traditionally struggled to cover the cost of producing electricity, leading the government to divert $2 billion annually as a subsidy, according to a recent report commissioned by the British government.
China meanwhile is ramping up investment in its South Asian neighbour as part of a $46 billion project unveiled last year that will link its far-western Xinjiang region to Pakistan''s Gwadar port with a series of infrastructure, power and transport upgrades. Last week Pakistan''s main bourse announced that a Chinese consortium was set to acquire a 40 percent stake in the stock exchange in a deal estimated at $84 million. Shanghai Electric announced in August it would buy a majority stake in the utility that supplies energy to Karachi for $1.7 billion, in the country''s biggest ever private-sector acquisition.

Copyright Agence France-Presse, 2016

Comments

Comments are closed.