AIRLINK 199.70 Increased By ▲ 1.73 (0.87%)
BOP 9.97 Decreased By ▼ -0.07 (-0.7%)
CNERGY 7.61 Increased By ▲ 0.32 (4.39%)
FCCL 39.25 Increased By ▲ 3.25 (9.03%)
FFL 16.83 Decreased By ▼ -0.08 (-0.47%)
FLYNG 27.54 Increased By ▲ 2.50 (9.98%)
HUBC 135.40 Increased By ▲ 1.37 (1.02%)
HUMNL 14.34 Increased By ▲ 0.20 (1.41%)
KEL 4.78 No Change ▼ 0.00 (0%)
KOSM 6.79 Decreased By ▼ -0.15 (-2.16%)
MLCF 46.53 Increased By ▲ 1.55 (3.45%)
OGDC 217.30 Decreased By ▼ -0.93 (-0.43%)
PACE 6.99 Increased By ▲ 0.05 (0.72%)
PAEL 41.56 Increased By ▲ 0.14 (0.34%)
PIAHCLA 17.04 Increased By ▲ 0.18 (1.07%)
PIBTL 8.56 Increased By ▲ 0.10 (1.18%)
POWER 9.70 Increased By ▲ 0.31 (3.3%)
PPL 184.25 Decreased By ▼ -1.68 (-0.9%)
PRL 42.45 Increased By ▲ 1.18 (2.86%)
PTC 25.10 Increased By ▲ 0.33 (1.33%)
SEARL 104.65 No Change ▼ 0.00 (0%)
SILK 1.01 No Change ▼ 0.00 (0%)
SSGC 40.63 Decreased By ▼ -0.28 (-0.68%)
SYM 17.84 Decreased By ▼ -0.21 (-1.16%)
TELE 8.88 Decreased By ▼ -0.03 (-0.34%)
TPLP 12.99 Increased By ▲ 0.15 (1.17%)
TRG 66.39 Decreased By ▼ -0.21 (-0.32%)
WAVESAPP 11.33 Increased By ▲ 0.03 (0.27%)
WTL 1.77 Decreased By ▼ -0.01 (-0.56%)
YOUW 4.00 No Change ▼ 0.00 (0%)
BR100 12,143 Increased By 33.4 (0.28%)
BR30 36,871 Increased By 273.4 (0.75%)
KSE100 115,188 Increased By 146.2 (0.13%)
KSE30 36,223 Increased By 23 (0.06%)
Pakistan

New pipelines being installed to provide uninterrupted gas supply

BAHAWALPUR: Regional Manager Sui Northern Gas Pipeline, Malik Bashir Ahmad has said that steps are being taken to en
Published November 2, 2018

BAHAWALPUR: Regional Manager Sui Northern Gas Pipeline, Malik Bashir Ahmad has said that steps are being taken to ensure uninterrupted supply of gas in the city.

According to Malik Bashir, the new gas pipeline of 49 kilometers long and 16-inch diameter would replace 11-inch diameter pipeline from Khairpur Daha to Bahawalpur which would help in smooth transmission of gas supply.

He said that with the installation of new pipeline, complaints related to low pressure or load shedding of gas during winter seasons would be overcome.

He informed that 8-inch diameter pipeline is being replaced with 14-inch diameter pipeline from Bhatta No 1 to Lari Adda via Model Town B and Model Town C with a cost of Rs 80 million.

The new pipelines are being installed throughout the city due to which line losses would be mitigated and gas would be supplied with full pressure, he maintained.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed.