AIRLINK 198.70 Increased By ▲ 0.73 (0.37%)
BOP 10.00 Decreased By ▼ -0.04 (-0.4%)
CNERGY 7.29 No Change ▼ 0.00 (0%)
FCCL 36.43 Increased By ▲ 0.43 (1.19%)
FFL 16.95 Increased By ▲ 0.04 (0.24%)
FLYNG 25.35 Increased By ▲ 0.31 (1.24%)
HUBC 134.50 Increased By ▲ 0.47 (0.35%)
HUMNL 14.11 Decreased By ▼ -0.03 (-0.21%)
KEL 4.72 Decreased By ▼ -0.06 (-1.26%)
KOSM 6.95 Increased By ▲ 0.01 (0.14%)
MLCF 45.34 Increased By ▲ 0.36 (0.8%)
OGDC 218.50 Increased By ▲ 0.27 (0.12%)
PACE 6.96 Increased By ▲ 0.02 (0.29%)
PAEL 41.02 Decreased By ▼ -0.40 (-0.97%)
PIAHCLA 16.86 No Change ▼ 0.00 (0%)
PIBTL 8.44 Decreased By ▼ -0.02 (-0.24%)
POWER 9.40 Increased By ▲ 0.01 (0.11%)
PPL 185.00 Decreased By ▼ -0.93 (-0.5%)
PRL 41.10 Decreased By ▼ -0.17 (-0.41%)
PTC 24.95 Increased By ▲ 0.18 (0.73%)
SEARL 103.15 Decreased By ▼ -1.50 (-1.43%)
SILK 1.03 Increased By ▲ 0.02 (1.98%)
SSGC 40.10 Decreased By ▼ -0.81 (-1.98%)
SYM 17.85 Decreased By ▼ -0.20 (-1.11%)
TELE 8.85 Decreased By ▼ -0.06 (-0.67%)
TPLP 12.80 Decreased By ▼ -0.04 (-0.31%)
TRG 67.25 Increased By ▲ 0.65 (0.98%)
WAVESAPP 11.45 Increased By ▲ 0.15 (1.33%)
WTL 1.76 Decreased By ▼ -0.02 (-1.12%)
YOUW 4.00 Decreased By ▼ -0.01 (-0.25%)
BR100 12,091 Decreased By -18.8 (-0.16%)
BR30 36,578 Decreased By -19.7 (-0.05%)
KSE100 115,109 Increased By 66.5 (0.06%)
KSE30 36,216 Increased By 16.4 (0.05%)
Pakistan

New pipelines being installed to provide uninterrupted gas supply

BAHAWALPUR: Regional Manager Sui Northern Gas Pipeline, Malik Bashir Ahmad has said that steps are being taken to en
Published November 2, 2018

BAHAWALPUR: Regional Manager Sui Northern Gas Pipeline, Malik Bashir Ahmad has said that steps are being taken to ensure uninterrupted supply of gas in the city.

According to Malik Bashir, the new gas pipeline of 49 kilometers long and 16-inch diameter would replace 11-inch diameter pipeline from Khairpur Daha to Bahawalpur which would help in smooth transmission of gas supply.

He said that with the installation of new pipeline, complaints related to low pressure or load shedding of gas during winter seasons would be overcome.

He informed that 8-inch diameter pipeline is being replaced with 14-inch diameter pipeline from Bhatta No 1 to Lari Adda via Model Town B and Model Town C with a cost of Rs 80 million.

The new pipelines are being installed throughout the city due to which line losses would be mitigated and gas would be supplied with full pressure, he maintained.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed.