AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)
Pakistan

New pipelines being installed to provide uninterrupted gas supply

BAHAWALPUR: Regional Manager Sui Northern Gas Pipeline, Malik Bashir Ahmad has said that steps are being taken to en
Published November 2, 2018

BAHAWALPUR: Regional Manager Sui Northern Gas Pipeline, Malik Bashir Ahmad has said that steps are being taken to ensure uninterrupted supply of gas in the city.

According to Malik Bashir, the new gas pipeline of 49 kilometers long and 16-inch diameter would replace 11-inch diameter pipeline from Khairpur Daha to Bahawalpur which would help in smooth transmission of gas supply.

He said that with the installation of new pipeline, complaints related to low pressure or load shedding of gas during winter seasons would be overcome.

He informed that 8-inch diameter pipeline is being replaced with 14-inch diameter pipeline from Bhatta No 1 to Lari Adda via Model Town B and Model Town C with a cost of Rs 80 million.

The new pipelines are being installed throughout the city due to which line losses would be mitigated and gas would be supplied with full pressure, he maintained.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed.