AIRLINK 200.02 Increased By ▲ 6.46 (3.34%)
BOP 10.23 Increased By ▲ 0.28 (2.81%)
CNERGY 7.83 Decreased By ▼ -0.10 (-1.26%)
FCCL 40.00 Decreased By ▼ -0.65 (-1.6%)
FFL 16.80 Decreased By ▼ -0.06 (-0.36%)
FLYNG 26.50 Decreased By ▼ -1.25 (-4.5%)
HUBC 132.79 Increased By ▲ 0.21 (0.16%)
HUMNL 13.99 Increased By ▲ 0.10 (0.72%)
KEL 4.67 Increased By ▲ 0.07 (1.52%)
KOSM 6.57 Decreased By ▼ -0.05 (-0.76%)
MLCF 46.66 Decreased By ▼ -0.94 (-1.97%)
OGDC 211.89 Decreased By ▼ -2.02 (-0.94%)
PACE 6.89 Decreased By ▼ -0.04 (-0.58%)
PAEL 41.34 Increased By ▲ 0.10 (0.24%)
PIAHCLA 17.02 Decreased By ▼ -0.13 (-0.76%)
PIBTL 8.13 Decreased By ▼ -0.28 (-3.33%)
POWER 9.37 Decreased By ▼ -0.27 (-2.8%)
PPL 181.45 Decreased By ▼ -0.90 (-0.49%)
PRL 41.60 Decreased By ▼ -0.36 (-0.86%)
PTC 24.69 Decreased By ▼ -0.21 (-0.84%)
SEARL 112.25 Increased By ▲ 5.41 (5.06%)
SILK 1.00 Increased By ▲ 0.01 (1.01%)
SSGC 44.00 Increased By ▲ 3.90 (9.73%)
SYM 19.18 Increased By ▲ 1.71 (9.79%)
TELE 8.91 Increased By ▲ 0.07 (0.79%)
TPLP 12.90 Increased By ▲ 0.15 (1.18%)
TRG 67.40 Increased By ▲ 0.45 (0.67%)
WAVESAPP 11.45 Increased By ▲ 0.12 (1.06%)
WTL 1.78 Decreased By ▼ -0.01 (-0.56%)
YOUW 4.00 Decreased By ▼ -0.07 (-1.72%)
BR100 12,170 Increased By 125.6 (1.04%)
BR30 36,589 Increased By 8.6 (0.02%)
KSE100 114,880 Increased By 842.7 (0.74%)
KSE30 36,125 Increased By 330.6 (0.92%)

In line with the Government of Punjab's plan to upgrade and improve the transport infrastructure bringing convenience and relief to the masses, the Punjab Masstransit Authority (PMA) is in the process of starting operations of the Integrated Public Transport System (Feeder Routes) in Multan, the 3rd largest city of Punjab with a growing population @ 2.60% per annum.
In first phase of the project, 11 feeder routes will be added to the Multan Metrobus System through operating 100 air conditioned buses expected to transport around 75,000 commuters on a daily basis. These feeder routes will have fare, operational and physical integration with Metrobus Line to ensure running of a fully integrated transport system within the city.
"The first batch of buses to run under the project has already arrived at Multan and the remaining buses are waiting to be transported from Karachi to Multan after Eid on completion of depots facilities and related infrastructure there. The team of Engineers also arrived along with buses to provide technical assistance in terms of driver's training and setting up maintenance operations, which has been completed.
The authorities has confirmed that the Feeder route operations are expected to start in the month of July and Veda is ready to start operating buses with full commitment" said Abdur Rehman, Chief Operating Officer, Veda Transit Solutions. Veda has been the official contractor of PMA for operating buses on these feeder routes. "The people of Multan are also eagerly waiting for the commencement of these feeder route operations to reap the benefit of this project" Abdur Rehman added.-PR

Comments

Comments are closed.