AIRLINK 206.10 Decreased By ▼ -6.72 (-3.16%)
BOP 10.15 Decreased By ▼ -0.10 (-0.98%)
CNERGY 6.70 Decreased By ▼ -0.30 (-4.29%)
FCCL 33.25 Decreased By ▼ -0.22 (-0.66%)
FFL 16.73 Decreased By ▼ -0.91 (-5.16%)
FLYNG 22.20 Increased By ▲ 0.38 (1.74%)
HUBC 128.00 Decreased By ▼ -1.11 (-0.86%)
HUMNL 14.07 Increased By ▲ 0.21 (1.52%)
KEL 4.79 Decreased By ▼ -0.07 (-1.44%)
KOSM 6.43 Decreased By ▼ -0.50 (-7.22%)
MLCF 42.50 Decreased By ▼ -1.13 (-2.59%)
OGDC 213.50 Increased By ▲ 0.55 (0.26%)
PACE 7.00 Decreased By ▼ -0.22 (-3.05%)
PAEL 41.40 Increased By ▲ 0.23 (0.56%)
PIAHCLA 16.80 Decreased By ▼ -0.03 (-0.18%)
PIBTL 8.35 Decreased By ▼ -0.28 (-3.24%)
POWER 8.85 Increased By ▲ 0.04 (0.45%)
PPL 184.70 Increased By ▲ 1.67 (0.91%)
PRL 38.64 Decreased By ▼ -0.99 (-2.5%)
PTC 24.38 Decreased By ▼ -0.35 (-1.42%)
SEARL 97.85 Decreased By ▼ -0.16 (-0.16%)
SILK 1.03 Increased By ▲ 0.02 (1.98%)
SSGC 40.36 Decreased By ▼ -1.37 (-3.28%)
SYM 18.09 Decreased By ▼ -0.77 (-4.08%)
TELE 8.99 Decreased By ▼ -0.01 (-0.11%)
TPLP 12.35 Decreased By ▼ -0.05 (-0.4%)
TRG 65.25 Decreased By ▼ -0.43 (-0.65%)
WAVESAPP 10.55 Decreased By ▼ -0.43 (-3.92%)
WTL 1.82 Increased By ▲ 0.03 (1.68%)
YOUW 4.03 No Change ▼ 0.00 (0%)
BR100 11,813 Decreased By -53.2 (-0.45%)
BR30 35,707 Increased By 9.7 (0.03%)
KSE100 113,378 Decreased By -770.4 (-0.67%)
KSE30 35,674 Decreased By -277.8 (-0.77%)

In line with the Government of Punjab's plan to upgrade and improve the transport infrastructure bringing convenience and relief to the masses, the Punjab Masstransit Authority (PMA) is in the process of starting operations of the Integrated Public Transport System (Feeder Routes) in Multan, the 3rd largest city of Punjab with a growing population @ 2.60% per annum.
In first phase of the project, 11 feeder routes will be added to the Multan Metrobus System through operating 100 air conditioned buses expected to transport around 75,000 commuters on a daily basis. These feeder routes will have fare, operational and physical integration with Metrobus Line to ensure running of a fully integrated transport system within the city.
"The first batch of buses to run under the project has already arrived at Multan and the remaining buses are waiting to be transported from Karachi to Multan after Eid on completion of depots facilities and related infrastructure there. The team of Engineers also arrived along with buses to provide technical assistance in terms of driver's training and setting up maintenance operations, which has been completed.
The authorities has confirmed that the Feeder route operations are expected to start in the month of July and Veda is ready to start operating buses with full commitment" said Abdur Rehman, Chief Operating Officer, Veda Transit Solutions. Veda has been the official contractor of PMA for operating buses on these feeder routes. "The people of Multan are also eagerly waiting for the commencement of these feeder route operations to reap the benefit of this project" Abdur Rehman added.-PR

Comments

Comments are closed.