AIRLINK 180.17 Decreased By ▼ -1.22 (-0.67%)
BOP 11.42 Increased By ▲ 0.25 (2.24%)
CNERGY 8.55 Increased By ▲ 0.01 (0.12%)
CPHL 95.23 Increased By ▲ 0.97 (1.03%)
FCCL 46.52 Increased By ▲ 0.34 (0.74%)
FFL 16.30 Increased By ▲ 0.64 (4.09%)
FLYNG 28.70 Increased By ▲ 0.52 (1.85%)
HUBC 145.24 Increased By ▲ 2.47 (1.73%)
HUMNL 13.10 Decreased By ▼ -0.14 (-1.06%)
KEL 4.50 Decreased By ▼ -0.03 (-0.66%)
KOSM 5.67 Decreased By ▼ -0.12 (-2.07%)
MLCF 69.44 Increased By ▲ 3.93 (6%)
OGDC 212.23 Decreased By ▼ -0.65 (-0.31%)
PACE 6.02 Decreased By ▼ -0.03 (-0.5%)
PAEL 47.89 Increased By ▲ 1.29 (2.77%)
PIAHCLA 18.00 Decreased By ▼ -0.17 (-0.94%)
PIBTL 10.58 Decreased By ▼ -0.03 (-0.28%)
POWER 13.54 Increased By ▲ 1.23 (9.99%)
PPL 170.81 Decreased By ▼ -0.09 (-0.05%)
PRL 34.67 Increased By ▲ 0.40 (1.17%)
PTC 22.64 Decreased By ▼ -0.22 (-0.96%)
SEARL 95.83 Increased By ▲ 0.88 (0.93%)
SSGC 43.37 Increased By ▲ 0.90 (2.12%)
SYM 14.19 No Change ▼ 0.00 (0%)
TELE 7.27 Increased By ▲ 0.06 (0.83%)
TPLP 9.89 Decreased By ▼ -0.02 (-0.2%)
TRG 65.60 Increased By ▲ 0.05 (0.08%)
WAVESAPP 9.80 Decreased By ▼ -0.05 (-0.51%)
WTL 1.33 Increased By ▲ 0.01 (0.76%)
YOUW 3.74 Decreased By ▼ -0.02 (-0.53%)
AIRLINK 180.17 Decreased By ▼ -1.22 (-0.67%)
BOP 11.42 Increased By ▲ 0.25 (2.24%)
CNERGY 8.55 Increased By ▲ 0.01 (0.12%)
CPHL 95.23 Increased By ▲ 0.97 (1.03%)
FCCL 46.52 Increased By ▲ 0.34 (0.74%)
FFL 16.30 Increased By ▲ 0.64 (4.09%)
FLYNG 28.70 Increased By ▲ 0.52 (1.85%)
HUBC 145.24 Increased By ▲ 2.47 (1.73%)
HUMNL 13.10 Decreased By ▼ -0.14 (-1.06%)
KEL 4.50 Decreased By ▼ -0.03 (-0.66%)
KOSM 5.67 Decreased By ▼ -0.12 (-2.07%)
MLCF 69.44 Increased By ▲ 3.93 (6%)
OGDC 212.23 Decreased By ▼ -0.65 (-0.31%)
PACE 6.02 Decreased By ▼ -0.03 (-0.5%)
PAEL 47.89 Increased By ▲ 1.29 (2.77%)
PIAHCLA 18.00 Decreased By ▼ -0.17 (-0.94%)
PIBTL 10.58 Decreased By ▼ -0.03 (-0.28%)
POWER 13.54 Increased By ▲ 1.23 (9.99%)
PPL 170.81 Decreased By ▼ -0.09 (-0.05%)
PRL 34.67 Increased By ▲ 0.40 (1.17%)
PTC 22.64 Decreased By ▼ -0.22 (-0.96%)
SEARL 95.83 Increased By ▲ 0.88 (0.93%)
SSGC 43.37 Increased By ▲ 0.90 (2.12%)
SYM 14.19 No Change ▼ 0.00 (0%)
TELE 7.27 Increased By ▲ 0.06 (0.83%)
TPLP 9.89 Decreased By ▼ -0.02 (-0.2%)
TRG 65.60 Increased By ▲ 0.05 (0.08%)
WAVESAPP 9.80 Decreased By ▼ -0.05 (-0.51%)
WTL 1.33 Increased By ▲ 0.01 (0.76%)
YOUW 3.74 Decreased By ▼ -0.02 (-0.53%)
BR100 12,702 Increased By 113.8 (0.9%)
BR30 38,258 Increased By 378.2 (1%)
KSE100 118,383 Increased By 1067.8 (0.91%)
KSE30 36,395 Increased By 278.8 (0.77%)

ISLAMABAD: Speaker National Assembly Asad Qaiser has said that during winter season there is a need to take steps to overcome low pressure of Sui gas in Peshawar and its surrounding areas on emergency basis.

He said that the provisions of basic facilities to the people and to solve their problems are the priorities of the government therefore steps are being taken on emergency basis for this purpose, said a press release issued here on Sunday.

Asad Qaiser chaired a meeting to resolve the issue of low pressure of Sui gas with Members of National Assembly and the officials of Sui Northern Gas Pipeline Limited.

MNAs Ali Muhammad Khan, Mujahid Khan, Noor Alam Khan, Arbab Sher Ali, Arbab Amir Ayub, Malik Anwar Taj, Usman Khan Tarakai, Managing Director SNGPL Amjad Latif, General Manager SNGPL Peshawar Saqib Arbab and their senior officials were present on the occasion.

While talking to the meeting, the Speaker said that the people of the Peshawar and their surrounding areas are facing problem due to low pressure of Sui Gas during winter.

In view of this public difficulty, he directed the SNGPL officials to resolve this matter immediately.

Earlier, MNAs from Peshawar informed the Speaker about the problems arising from low pressure of gas in Peshawar and its adjacent areas.

On this occasion, MD SNGPL Amjad Latif and GM SNGPL Peshawar told the speaker that the mega project has been started to solve the problem of low pressure of Sui gas in Peshawar.

Under this project, a new transmission line is being attached with the existing transmission line from Dara Adam khel to Hayatabad, which covers 32 kilometers long and the project, will be completed in December this year.

He further added that Gas lines are being upgraded in the city.

He assured the speaker that the completion of this transmission line would reduce the low pressure of gas in Peshawar and its adjacent areas

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed.