AGL 40.22 Increased By ▲ 0.22 (0.55%)
AIRLINK 127.05 Increased By ▲ 0.01 (0.01%)
BOP 6.61 Decreased By ▼ -0.06 (-0.9%)
CNERGY 4.51 No Change ▼ 0.00 (0%)
DCL 8.54 Decreased By ▼ -0.01 (-0.12%)
DFML 42.25 Increased By ▲ 0.81 (1.95%)
DGKC 87.30 Increased By ▲ 0.45 (0.52%)
FCCL 32.65 Increased By ▲ 0.37 (1.15%)
FFBL 65.21 Increased By ▲ 0.41 (0.63%)
FFL 10.25 No Change ▼ 0.00 (0%)
HUBC 109.78 Increased By ▲ 0.21 (0.19%)
HUMNL 14.58 Decreased By ▼ -0.10 (-0.68%)
KEL 5.12 Increased By ▲ 0.07 (1.39%)
KOSM 7.62 Increased By ▲ 0.16 (2.14%)
MLCF 41.65 Increased By ▲ 0.27 (0.65%)
NBP 59.65 Decreased By ▼ -0.76 (-1.26%)
OGDC 194.49 Increased By ▲ 4.39 (2.31%)
PAEL 28.20 Increased By ▲ 0.37 (1.33%)
PIBTL 7.89 Increased By ▲ 0.06 (0.77%)
PPL 152.15 Increased By ▲ 2.09 (1.39%)
PRL 26.56 Decreased By ▼ -0.32 (-1.19%)
PTC 16.00 Decreased By ▼ -0.07 (-0.44%)
SEARL 83.06 Decreased By ▼ -2.94 (-3.42%)
TELE 7.49 Decreased By ▼ -0.22 (-2.85%)
TOMCL 35.45 Increased By ▲ 0.04 (0.11%)
TPLP 8.14 Increased By ▲ 0.02 (0.25%)
TREET 16.14 Decreased By ▼ -0.27 (-1.65%)
TRG 52.78 Decreased By ▼ -0.51 (-0.96%)
UNITY 26.50 Increased By ▲ 0.34 (1.3%)
WTL 1.25 Decreased By ▼ -0.01 (-0.79%)
BR100 9,927 Increased By 42.9 (0.43%)
BR30 30,852 Increased By 252.1 (0.82%)
KSE100 93,817 Increased By 461.7 (0.49%)
KSE30 29,072 Increased By 140.8 (0.49%)

Chief Minister Syed Murad Ali Shah said on Wednesday that repair and maintenance work on embankments (bunds), particularly the more vulnerable points, is going in full swing. Presiding over a meeting at the Chief Minister's House, he said that he had held a number of meetings before the start of the flood season to discuss arrangements for the strengthening of vulnerable points.
The meeting was told that pre-abkalyani measures were taken from June 1, under which maintenance work was in progress on the embankments to make them accessible for vehicles. Katcha landhis have also been constructed at every half mile from each embankment where abkalyani material such as hurricane lamps, torches, empty gunny bags, bamboos have deployed at vulnerable points. The chief minister directed the chief engineers to keep monitoring the stone pitching work being carried out at vulnerable points.

Comments

Comments are closed.