AIRLINK 193.56 Decreased By ▼ -1.27 (-0.65%)
BOP 9.95 Increased By ▲ 0.14 (1.43%)
CNERGY 7.93 Increased By ▲ 0.57 (7.74%)
FCCL 40.65 Increased By ▲ 2.07 (5.37%)
FFL 16.86 Increased By ▲ 0.41 (2.49%)
FLYNG 27.75 Increased By ▲ 0.21 (0.76%)
HUBC 132.58 Increased By ▲ 0.83 (0.63%)
HUMNL 13.89 Increased By ▲ 0.03 (0.22%)
KEL 4.60 Decreased By ▼ -0.06 (-1.29%)
KOSM 6.62 Decreased By ▼ -0.04 (-0.6%)
MLCF 47.60 Increased By ▲ 2.21 (4.87%)
OGDC 213.91 Decreased By ▼ -0.08 (-0.04%)
PACE 6.93 Increased By ▲ 0.07 (1.02%)
PAEL 41.24 Increased By ▲ 1.18 (2.95%)
PIAHCLA 17.15 Increased By ▲ 0.36 (2.14%)
PIBTL 8.41 Increased By ▲ 0.09 (1.08%)
POWER 9.64 Increased By ▲ 0.21 (2.23%)
PPL 182.35 Increased By ▲ 0.16 (0.09%)
PRL 41.96 Increased By ▲ 0.13 (0.31%)
PTC 24.90 Increased By ▲ 0.34 (1.38%)
SEARL 106.84 Increased By ▲ 4.31 (4.2%)
SILK 0.99 Decreased By ▼ -0.01 (-1%)
SSGC 40.10 Increased By ▲ 0.66 (1.67%)
SYM 17.47 Increased By ▲ 0.14 (0.81%)
TELE 8.84 Increased By ▲ 0.08 (0.91%)
TPLP 12.75 No Change ▼ 0.00 (0%)
TRG 66.95 Increased By ▲ 1.55 (2.37%)
WAVESAPP 11.33 Increased By ▲ 0.22 (1.98%)
WTL 1.79 Increased By ▲ 0.09 (5.29%)
YOUW 4.07 Increased By ▲ 0.13 (3.3%)
BR100 12,045 Increased By 70.8 (0.59%)
BR30 36,580 Increased By 433.6 (1.2%)
KSE100 114,038 Increased By 594.4 (0.52%)
KSE30 35,794 Increased By 159 (0.45%)

Khyber Pakhtunkhwa Minister for local government and rural development, Inayatullah Khan, has revealed that the Greater Water Supply Scheme Peshawar (GWSSP) was delayed due to financial constraints. However, he said the project is still under consideration for implementation through province' own financial resources instead of donors assistance to provide clean drinking water to the residents of provincial metropolis.
Speaking at a news conference here at Peshawar Press Club on Friday, he said the provincial government has planned to supply water from the two major water reservoirs, including Warsak and Bara Dams to provide drinking water to Peshawarites under the Greater Water Supply Scheme Peshawar.
The Minister said that the project requires huge funds, which could not be executed without foreign financial assistance. However, he expressed hope that fiscal space would be created within the next two to three years, and then the provincial government would have the required funds to commission the project by its own financial resources.
According to media reports, the Khyber Pakhtunkhwa government would require around Rs 50billion to execute the much-awaited Greater Water Supply Scheme Peshawar to provide clean drinking water to the residents of provincial metropolis. About the increase in water bills tariff, the Minister said that an independent board of Water and Sanitation Services Peshawar (WSSP) had approved the hike in tariff, which need to be reviewed after the mass agitation against it.
Regarding the replacement of rusted water pipelines and drainage system, he said that the department is taking practical measures to overcome issues. However, he said the drainage system requires an entire revamping in the provincial capital Peshawar. He emphasized the need for the development of system to address the increasing civic issues across the province.
When asked about the dilapidated state of General bus stand in Peshawar, he replied that the provincial government had planned to shift the existing 'Peshawar bus Adda' out of city for which 800 Kanals land have been acquired to construct state-of-the art bus terminal. While, he maintained that a modern shopping mall and civic centre along with CPEC tower would be constructed at the 144 to 152 Kanals land of General bus stand in Peshawar.

Comments

Comments are closed.