AIRLINK 200.02 Increased By ▲ 6.46 (3.34%)
BOP 10.23 Increased By ▲ 0.28 (2.81%)
CNERGY 7.83 Decreased By ▼ -0.10 (-1.26%)
FCCL 40.00 Decreased By ▼ -0.65 (-1.6%)
FFL 16.80 Decreased By ▼ -0.06 (-0.36%)
FLYNG 26.50 Decreased By ▼ -1.25 (-4.5%)
HUBC 132.79 Increased By ▲ 0.21 (0.16%)
HUMNL 13.99 Increased By ▲ 0.10 (0.72%)
KEL 4.67 Increased By ▲ 0.07 (1.52%)
KOSM 6.57 Decreased By ▼ -0.05 (-0.76%)
MLCF 46.66 Decreased By ▼ -0.94 (-1.97%)
OGDC 211.89 Decreased By ▼ -2.02 (-0.94%)
PACE 6.89 Decreased By ▼ -0.04 (-0.58%)
PAEL 41.34 Increased By ▲ 0.10 (0.24%)
PIAHCLA 17.02 Decreased By ▼ -0.13 (-0.76%)
PIBTL 8.13 Decreased By ▼ -0.28 (-3.33%)
POWER 9.37 Decreased By ▼ -0.27 (-2.8%)
PPL 181.45 Decreased By ▼ -0.90 (-0.49%)
PRL 41.60 Decreased By ▼ -0.36 (-0.86%)
PTC 24.69 Decreased By ▼ -0.21 (-0.84%)
SEARL 112.25 Increased By ▲ 5.41 (5.06%)
SILK 1.00 Increased By ▲ 0.01 (1.01%)
SSGC 44.00 Increased By ▲ 3.90 (9.73%)
SYM 19.18 Increased By ▲ 1.71 (9.79%)
TELE 8.91 Increased By ▲ 0.07 (0.79%)
TPLP 12.90 Increased By ▲ 0.15 (1.18%)
TRG 67.40 Increased By ▲ 0.45 (0.67%)
WAVESAPP 11.45 Increased By ▲ 0.12 (1.06%)
WTL 1.78 Decreased By ▼ -0.01 (-0.56%)
YOUW 4.00 Decreased By ▼ -0.07 (-1.72%)
BR100 12,170 Increased By 125.6 (1.04%)
BR30 36,589 Increased By 8.6 (0.02%)
KSE100 114,880 Increased By 842.7 (0.74%)
KSE30 36,125 Increased By 330.6 (0.92%)

The Tourism Department is spending Rs 2.5 billion on beautification and infrastructure development projects in the scenic Naran and Kalam valleys of Khyber Pakhtunkhwa to facilitate tourists. Speaking at a meeting, Secretary Sports, Tourism, Museums, Archaeology, Culture and Youth Affairs Muhammad Tariq said that several uplift projects were being executed under the Tourism Integrated Area Development Unit (TAIDU) and the relevant quarters had been directed to expedite pace of work on the schemes.
The official said that a number of projects costing Rs 1.2 billion include construction of main Kalam Road, Bazar Road, Deputy Commissioner Cottage Road, DIG Cottage Road and widening and rehabilitation of other roads in Boeen, Kalam Kokonail, Tehsil, Gayail, Gargalor and Nabal areas. The secretary said that rest areas, food street, recreational park, hotels and restaurants were being reconstructed and renovated at different areas in the Kalam tourist spot.
The meeting was told that work was also going on seven other development projects in Kalam, which will complete in mid-September. Beside these, over Rs 1.3 billion were being spent on various development and reconstruction projects in Naran and Kaghan valleys. The projects, he said, included construction of various roads to Saiful Muluk Lake, Paras-Sharan road, Jaraid-Shogran road, rest areas, entrance routes and installation of street lights, beautification of bazars, food streets, children park, flower market, cricket ground and drainage system.

Comments

Comments are closed.