AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

BAHAWALPUR: Sui Northern Gas Pipeline Limited (SNGPL) Regional Manager Malik Bashir Ahmed Tuesday said long term steps are being taken to improve gas pressure across Bahawalpur division.

Talking to reporters, he said a project is underway to replace a 11-inch pipeline from Khairpur Daha to Bahawalpur with 16-inch.

A huge amount would be spent on the 49-kilometre pipeline project and complaints of low pressure during the winter season would also be addressed, he added.

He said Ahmedpur Road Chowk Bhatta No1 to Model Town B, Model Town C to General Bus Stand 4-inch wide pipeline will be replaced with 8-inch line. On the replacing of the 4.5 kilometre long pipeline, around Rs80 million will be spent, he said.

With the change of the line, Shahdra, Kausar Colony, Model Town B, Model Town C and its adjoining areas will have sufficient pressure of gas, he said.

He said current pipeline with 4-inch of width was not enough for the needs, he said and added the project would start from December this year.

He said the process of changing the pipelines throughout the city was in progress. He said it would reduce the line losses and rectify the complaints of low pressure.

He said replacing of pipelines in Model Town B had been completed. He further said bribe and intercession culture in SNGPL matters had been finished and now every task is being done on merit.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed.