AGL 40.01 Decreased By ▼ -0.20 (-0.5%)
AIRLINK 127.00 Decreased By ▼ -0.64 (-0.5%)
BOP 6.69 Increased By ▲ 0.02 (0.3%)
CNERGY 4.51 Increased By ▲ 0.06 (1.35%)
DCL 8.64 Decreased By ▼ -0.09 (-1.03%)
DFML 41.04 Decreased By ▼ -0.12 (-0.29%)
DGKC 85.61 Decreased By ▼ -0.50 (-0.58%)
FCCL 33.11 Increased By ▲ 0.55 (1.69%)
FFBL 66.10 Increased By ▲ 1.72 (2.67%)
FFL 11.55 Decreased By ▼ -0.06 (-0.52%)
HUBC 111.11 Decreased By ▼ -1.35 (-1.2%)
HUMNL 14.82 Increased By ▲ 0.01 (0.07%)
KEL 5.17 Increased By ▲ 0.13 (2.58%)
KOSM 7.66 Increased By ▲ 0.30 (4.08%)
MLCF 40.21 Decreased By ▼ -0.12 (-0.3%)
NBP 60.51 Decreased By ▼ -0.57 (-0.93%)
OGDC 194.10 Decreased By ▼ -0.08 (-0.04%)
PAEL 26.72 Decreased By ▼ -0.19 (-0.71%)
PIBTL 7.37 Increased By ▲ 0.09 (1.24%)
PPL 153.79 Increased By ▲ 1.11 (0.73%)
PRL 26.21 Decreased By ▼ -0.01 (-0.04%)
PTC 17.18 Increased By ▲ 1.04 (6.44%)
SEARL 85.60 Decreased By ▼ -0.10 (-0.12%)
TELE 7.57 Decreased By ▼ -0.10 (-1.3%)
TOMCL 34.39 Decreased By ▼ -2.08 (-5.7%)
TPLP 8.82 Increased By ▲ 0.03 (0.34%)
TREET 16.82 Decreased By ▼ -0.02 (-0.12%)
TRG 62.55 Decreased By ▼ -0.19 (-0.3%)
UNITY 27.29 Decreased By ▼ -0.91 (-3.23%)
WTL 1.30 Decreased By ▼ -0.04 (-2.99%)
BR100 10,112 Increased By 26 (0.26%)
BR30 31,188 Increased By 17.5 (0.06%)
KSE100 94,996 Increased By 232 (0.24%)
KSE30 29,481 Increased By 71 (0.24%)

BAHAWALPUR: Sui Northern Gas Pipeline Limited (SNGPL) Regional Manager Malik Bashir Ahmed Tuesday said long term steps are being taken to improve gas pressure across Bahawalpur division.

Talking to reporters, he said a project is underway to replace a 11-inch pipeline from Khairpur Daha to Bahawalpur with 16-inch.

A huge amount would be spent on the 49-kilometre pipeline project and complaints of low pressure during the winter season would also be addressed, he added.

He said Ahmedpur Road Chowk Bhatta No1 to Model Town B, Model Town C to General Bus Stand 4-inch wide pipeline will be replaced with 8-inch line. On the replacing of the 4.5 kilometre long pipeline, around Rs80 million will be spent, he said.

With the change of the line, Shahdra, Kausar Colony, Model Town B, Model Town C and its adjoining areas will have sufficient pressure of gas, he said.

He said current pipeline with 4-inch of width was not enough for the needs, he said and added the project would start from December this year.

He said the process of changing the pipelines throughout the city was in progress. He said it would reduce the line losses and rectify the complaints of low pressure.

He said replacing of pipelines in Model Town B had been completed. He further said bribe and intercession culture in SNGPL matters had been finished and now every task is being done on merit.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed.