AGL 38.16 Decreased By ▼ -0.06 (-0.16%)
AIRLINK 134.19 Increased By ▲ 5.22 (4.05%)
BOP 8.85 Increased By ▲ 1.00 (12.74%)
CNERGY 4.69 Increased By ▲ 0.03 (0.64%)
DCL 8.67 Increased By ▲ 0.35 (4.21%)
DFML 39.78 Increased By ▲ 0.84 (2.16%)
DGKC 85.15 Increased By ▲ 3.21 (3.92%)
FCCL 34.90 Increased By ▲ 1.48 (4.43%)
FFBL 75.60 Decreased By ▼ -0.11 (-0.15%)
FFL 12.74 Decreased By ▼ -0.08 (-0.62%)
HUBC 109.45 Decreased By ▼ -0.91 (-0.82%)
HUMNL 14.10 Increased By ▲ 0.09 (0.64%)
KEL 5.40 Increased By ▲ 0.25 (4.85%)
KOSM 7.75 Increased By ▲ 0.08 (1.04%)
MLCF 41.37 Increased By ▲ 1.57 (3.94%)
NBP 69.70 Decreased By ▼ -2.62 (-3.62%)
OGDC 193.62 Increased By ▲ 5.33 (2.83%)
PAEL 26.21 Increased By ▲ 0.58 (2.26%)
PIBTL 7.42 Increased By ▲ 0.05 (0.68%)
PPL 163.85 Increased By ▲ 11.18 (7.32%)
PRL 26.36 Increased By ▲ 0.97 (3.82%)
PTC 19.47 Increased By ▲ 1.77 (10%)
SEARL 84.40 Increased By ▲ 1.98 (2.4%)
TELE 7.99 Increased By ▲ 0.40 (5.27%)
TOMCL 34.05 Increased By ▲ 1.48 (4.54%)
TPLP 8.72 Increased By ▲ 0.30 (3.56%)
TREET 17.18 Increased By ▲ 0.40 (2.38%)
TRG 61.00 Increased By ▲ 4.96 (8.85%)
UNITY 28.96 Increased By ▲ 0.18 (0.63%)
WTL 1.37 Increased By ▲ 0.02 (1.48%)
BR100 10,786 Increased By 127.6 (1.2%)
BR30 32,266 Increased By 934.6 (2.98%)
KSE100 100,083 Increased By 813.5 (0.82%)
KSE30 31,193 Increased By 160.9 (0.52%)

The commissioning of Pakistan's second LNG terminal represents a significant step forward for our country's energy security and for the global energy sector. This project is proof that Pakistan is building a safe and secure future for our children. This terminal will increase the country's LNG regasification capacity to 1.2bcf and go a long way towards fulfilling the government's vision of ensuring continuous and affordable energy to the people and to crucial sectors of our economy. This project is a testament to the highest standards of probity, fairness, and transparency. I congratulate everyone involved in bringing this mega project to life.
Mr. Sikandar Sultan Raja, Federal Secretary, Petroleum Division, Ministry of Energy
It is with immense pleasure that we, FOTCO, announce the successful completion of the RLNG high-pressure pipeline and measurement system for Pakistan's second LNG terminal. The FOTCO pipeline will relay RLNG from the PGPC jetty to the delivery point on the national gas grid through a 1.3-kilometer subsea pipeline section, a 4-kilometer trestle-mounted section, and a 7-kilometer onshore and underground section. FOTCO feels very proud to be an integral part of this energy infrastructure project, which is of significant national importance. The pipeline has an inherent design capacity of 1.2bcfd; it will therefore, also be available for the transmission of additional RLNG volumes from PGPL's upcoming second LNG import terminal.
Lt. Gen. Khalid Nawaz Khan, Hi (M) (Retired), Managing Director and Chairman, FOTCO
Port Qasim Authority congratulates PGPC on the completion of its LNG import terminal. This is the country's second LNG terminal. The first, also located at Port Qasim, was commissioned in March 2015. The port's strategic location allows it to serve as a hub for Pakistan's economic growth, and with these two terminals - and the others planned at Port Qasim - PQA is fulfilling its potential as a vital and unparalleled growth driver for the country. Mr. Agha Jan Akhtar, Chairman, Port Qasim Authority

Comments

Comments are closed.