AIRLINK 196.50 Increased By ▲ 2.94 (1.52%)
BOP 10.25 Increased By ▲ 0.30 (3.02%)
CNERGY 7.88 Decreased By ▼ -0.05 (-0.63%)
FCCL 39.80 Decreased By ▼ -0.85 (-2.09%)
FFL 17.09 Increased By ▲ 0.23 (1.36%)
FLYNG 27.12 Decreased By ▼ -0.63 (-2.27%)
HUBC 133.95 Increased By ▲ 1.37 (1.03%)
HUMNL 14.10 Increased By ▲ 0.21 (1.51%)
KEL 4.78 Increased By ▲ 0.18 (3.91%)
KOSM 6.64 Increased By ▲ 0.02 (0.3%)
MLCF 47.18 Decreased By ▼ -0.42 (-0.88%)
OGDC 214.79 Increased By ▲ 0.88 (0.41%)
PACE 6.96 Increased By ▲ 0.03 (0.43%)
PAEL 42.00 Increased By ▲ 0.76 (1.84%)
PIAHCLA 17.15 No Change ▼ 0.00 (0%)
PIBTL 8.50 Increased By ▲ 0.09 (1.07%)
POWER 9.60 Decreased By ▼ -0.04 (-0.41%)
PPL 183.96 Increased By ▲ 1.61 (0.88%)
PRL 42.90 Increased By ▲ 0.94 (2.24%)
PTC 25.15 Increased By ▲ 0.25 (1%)
SEARL 109.80 Increased By ▲ 2.96 (2.77%)
SILK 1.00 Increased By ▲ 0.01 (1.01%)
SSGC 44.11 Increased By ▲ 4.01 (10%)
SYM 17.86 Increased By ▲ 0.39 (2.23%)
TELE 8.96 Increased By ▲ 0.12 (1.36%)
TPLP 13.06 Increased By ▲ 0.31 (2.43%)
TRG 67.60 Increased By ▲ 0.65 (0.97%)
WAVESAPP 11.68 Increased By ▲ 0.35 (3.09%)
WTL 1.83 Increased By ▲ 0.04 (2.23%)
YOUW 3.97 Decreased By ▼ -0.10 (-2.46%)
BR100 12,249 Increased By 204.5 (1.7%)
BR30 36,933 Increased By 352.6 (0.96%)
KSE100 115,663 Increased By 1625.1 (1.43%)
KSE30 36,398 Increased By 603.9 (1.69%)

The teams of Peshawar Electric Supply Company (Pesco) disconnected power supply to 2 tube-wells and street-lights at Kohat City in recovery campaign against public and private sector power defaulters. An amount of Rs 10.80 was outstanding against these installations. Similarly, power supply to 7 tube-wells of TMA Bannu was also disconnected due to non-payment of Rs 7.3 Million.
The Pesco teams also disconnected power supply to 7 street lights in Hangu, water supply schemes at Tall, degree college Tall due to non-payment of Rs 1.7 million. Power supply disconnected to irrigation tube wells Pehur, Lahore and Swabi due to non-payment of Rs 4.6 million. Power supply to WSS Jinnahabad Mardan, Indus tobacco Industry, Shad Pipe Industrial state Mardan was also disconnected due to non-payment of Rs 1.89 million.
Meanwhile, a spokesman of Pesco has warned all the defaulter government departments and private defaulter customers are warned to immediately deposit their outstanding dues, otherwise their power supply will be disconnected immediately, and strict action will also be taken. In case of non-payment of arrears, disconnection of the premises, arresting of the defaulters and confiscation of the property will also be done, under the new rules.

Comments

Comments are closed.