AIRLINK 206.75 Decreased By ▼ -6.07 (-2.85%)
BOP 10.25 No Change ▼ 0.00 (0%)
CNERGY 6.74 Decreased By ▼ -0.26 (-3.71%)
FCCL 33.35 Decreased By ▼ -0.12 (-0.36%)
FFL 16.82 Decreased By ▼ -0.82 (-4.65%)
FLYNG 22.50 Increased By ▲ 0.68 (3.12%)
HUBC 128.40 Decreased By ▼ -0.71 (-0.55%)
HUMNL 14.06 Increased By ▲ 0.20 (1.44%)
KEL 4.83 Decreased By ▼ -0.03 (-0.62%)
KOSM 6.44 Decreased By ▼ -0.49 (-7.07%)
MLCF 42.80 Decreased By ▼ -0.83 (-1.9%)
OGDC 215.45 Increased By ▲ 2.50 (1.17%)
PACE 7.05 Decreased By ▼ -0.17 (-2.35%)
PAEL 41.45 Increased By ▲ 0.28 (0.68%)
PIAHCLA 16.82 Decreased By ▼ -0.01 (-0.06%)
PIBTL 8.40 Decreased By ▼ -0.23 (-2.67%)
POWER 8.83 Increased By ▲ 0.02 (0.23%)
PPL 185.35 Increased By ▲ 2.32 (1.27%)
PRL 38.80 Decreased By ▼ -0.83 (-2.09%)
PTC 24.60 Decreased By ▼ -0.13 (-0.53%)
SEARL 98.60 Increased By ▲ 0.59 (0.6%)
SILK 1.01 No Change ▼ 0.00 (0%)
SSGC 40.56 Decreased By ▼ -1.17 (-2.8%)
SYM 18.08 Decreased By ▼ -0.78 (-4.14%)
TELE 9.10 Increased By ▲ 0.10 (1.11%)
TPLP 12.45 Increased By ▲ 0.05 (0.4%)
TRG 65.65 Decreased By ▼ -0.03 (-0.05%)
WAVESAPP 10.70 Decreased By ▼ -0.28 (-2.55%)
WTL 1.82 Increased By ▲ 0.03 (1.68%)
YOUW 4.02 Decreased By ▼ -0.01 (-0.25%)
BR100 11,839 Decreased By -27.2 (-0.23%)
BR30 35,827 Increased By 129.6 (0.36%)
KSE100 113,626 Decreased By -522.9 (-0.46%)
KSE30 35,764 Decreased By -188 (-0.52%)

A infrastructure failure linked to Pakistan GasPort, the country's second liquefied natural gas (LNG) import project, is expected to take around 10 days to repair, prompting multiple shipments to be cancelled or diverted, trade sources said.
On top of the two cargoes traders believe have already been cancelled or diverted away from the terminal, Pakistan is in talks with suppliers to potentially delay, divert or declare force majeure on deliveries until the problem is fixed, the sources said.
That would release added supply into Asian spot markets with a potentially bearish price impact. The problem, linked to a pipeline blast or a gas leak, occurred on Tuesday, several trade and industry sources said. It occurred as LNG converted back into natural gas onboard a floating import terminal was pumped through pipelines to the shore, two industry sources said. It remains unclear if additional fixes to infrastructure will be needed that might delay the terminal's restart, they said.

Comments

Comments are closed.