AGL 41.50 Increased By ▲ 2.96 (7.68%)
AIRLINK 128.00 Decreased By ▼ -1.50 (-1.16%)
BOP 6.26 Increased By ▲ 0.65 (11.59%)
CNERGY 4.13 Increased By ▲ 0.27 (6.99%)
DCL 8.44 Decreased By ▼ -0.29 (-3.32%)
DFML 40.69 Decreased By ▼ -1.07 (-2.56%)
DGKC 87.90 Decreased By ▼ -0.40 (-0.45%)
FCCL 34.10 Decreased By ▼ -0.90 (-2.57%)
FFBL 66.33 Decreased By ▼ -1.02 (-1.51%)
FFL 10.56 Decreased By ▼ -0.05 (-0.47%)
HUBC 108.70 Decreased By ▼ -0.06 (-0.06%)
HUMNL 14.46 Decreased By ▼ -0.20 (-1.36%)
KEL 4.65 Decreased By ▼ -0.10 (-2.11%)
KOSM 7.33 Increased By ▲ 0.38 (5.47%)
MLCF 42.72 Increased By ▲ 1.07 (2.57%)
NBP 60.84 Increased By ▲ 1.24 (2.08%)
OGDC 178.97 Decreased By ▼ -4.03 (-2.2%)
PAEL 25.70 Decreased By ▼ -0.55 (-2.1%)
PIBTL 6.06 Increased By ▲ 0.09 (1.51%)
PPL 146.15 Decreased By ▼ -0.55 (-0.37%)
PRL 24.91 Increased By ▲ 1.30 (5.51%)
PTC 16.14 Decreased By ▼ -0.42 (-2.54%)
SEARL 70.20 Increased By ▲ 1.90 (2.78%)
TELE 7.22 Decreased By ▼ -0.01 (-0.14%)
TOMCL 36.20 Increased By ▲ 0.25 (0.7%)
TPLP 7.84 Decreased By ▼ -0.01 (-0.13%)
TREET 15.59 Increased By ▲ 1.39 (9.79%)
TRG 50.36 Decreased By ▼ -0.09 (-0.18%)
UNITY 26.90 Increased By ▲ 0.15 (0.56%)
WTL 1.24 Increased By ▲ 0.03 (2.48%)
BR100 9,795 Decreased By -11.1 (-0.11%)
BR30 29,647 Decreased By -31.2 (-0.1%)
KSE100 92,021 Decreased By -282.9 (-0.31%)
KSE30 28,665 Decreased By -175.5 (-0.61%)

Punjab Chief Minister Shehbaz Sharif is set to inaugurate the southern loop of Lahore Ring Road on December 22 as the development works have been completed and the project is ready to be used by commuters, said sources in the Lahore Ring Road Authority. Intelligent transportation system (ITS) and closed-circuit television (CCTV) cameras have been installed throughout the road for monitoring and security purposes, they added.
The earlier deadline was set as July 2017 which could not be met due to successive litigation on land acquisition process. It may be noted that the project was conceived a decade back but failed to materialize because of political reasons and lack of resources.
The southern loop is 22.35 kilometres starting from Kamahan to Adda Plot (Raiwind) consisting of 15 subways for pedestrian and vehicular traffic. This loop will improve traffic management besides reducing the travelling time between north and south parts of the city.

Comments

Comments are closed.