AGL 37.89 Decreased By ▼ -1.69 (-4.27%)
AIRLINK 126.00 Decreased By ▼ -5.22 (-3.98%)
BOP 6.83 Increased By ▲ 0.02 (0.29%)
CNERGY 4.45 Decreased By ▼ -0.26 (-5.52%)
DCL 7.89 Decreased By ▼ -0.55 (-6.52%)
DFML 37.32 Decreased By ▼ -4.15 (-10.01%)
DGKC 77.50 Decreased By ▼ -4.59 (-5.59%)
FCCL 30.60 Decreased By ▼ -2.50 (-7.55%)
FFBL 69.02 Decreased By ▼ -3.85 (-5.28%)
FFL 11.89 Decreased By ▼ -0.37 (-3.02%)
HUBC 105.50 Decreased By ▼ -5.24 (-4.73%)
HUMNL 13.50 Decreased By ▼ -1.01 (-6.96%)
KEL 4.67 Decreased By ▼ -0.52 (-10.02%)
KOSM 7.28 Decreased By ▼ -0.33 (-4.34%)
MLCF 36.60 Decreased By ▼ -2.30 (-5.91%)
NBP 65.30 Increased By ▲ 1.29 (2.02%)
OGDC 181.00 Decreased By ▼ -11.82 (-6.13%)
PAEL 24.58 Decreased By ▼ -1.10 (-4.28%)
PIBTL 7.15 Decreased By ▼ -0.19 (-2.59%)
PPL 144.00 Decreased By ▼ -10.07 (-6.54%)
PRL 24.40 Decreased By ▼ -1.43 (-5.54%)
PTC 16.40 Decreased By ▼ -1.41 (-7.92%)
SEARL 78.61 Decreased By ▼ -3.69 (-4.48%)
TELE 7.20 Decreased By ▼ -0.56 (-7.22%)
TOMCL 32.01 Decreased By ▼ -1.45 (-4.33%)
TPLP 8.15 Decreased By ▼ -0.34 (-4%)
TREET 16.10 Decreased By ▼ -0.52 (-3.13%)
TRG 54.89 Decreased By ▼ -2.51 (-4.37%)
UNITY 27.50 Decreased By ▼ -0.01 (-0.04%)
WTL 1.29 Decreased By ▼ -0.08 (-5.84%)
BR100 10,116 Decreased By -388.7 (-3.7%)
BR30 29,567 Decreased By -1659.1 (-5.31%)
KSE100 94,574 Decreased By -3505.6 (-3.57%)
KSE30 29,445 Decreased By -1113.9 (-3.65%)

President Pakistan Businessmen and Intellectuals Forum (PBIF), Mian Zahid Hussain has said that the government failed to pay attention to the transmission, distribution and billing system. Feeders usually trip frequently creating problems for masses and the economy; therefore, this sector should be improved.
He said energy situation is improving in the country despite prolonged circular debt. The government settled the infamous circular debt soon after assuming power with a promise that the issue has been buried forever which proved otherwise, he said.
The debt resurfaced soon but government pressed with the plan to establish new power projects and completed forty-seven big and small projects since 2013 improving production capacity by 8694 megawatts, he added. Mian Zahid said that the government completed ten power production projects in 2013; seven more projects became functional in 2014 followed by six power projects in 2015.
Ten projects were completed in 2016 and fourteen during the last year which included LNG-based, coal-fired and nuclear power projects. Few big projects would be completed in the ongoing year of 2018 which will improve power generation capacity but weak transmission and distribution system will pose a serious threat to the situation.

Copyright Business Recorder, 2018

Comments

Comments are closed.