AIRLINK 191.54 Decreased By ▼ -21.28 (-10%)
BOP 10.21 Decreased By ▼ -0.04 (-0.39%)
CNERGY 6.69 Decreased By ▼ -0.31 (-4.43%)
FCCL 33.02 Decreased By ▼ -0.45 (-1.34%)
FFL 16.64 Decreased By ▼ -1.00 (-5.67%)
FLYNG 22.46 Increased By ▲ 0.64 (2.93%)
HUBC 127.15 Decreased By ▼ -1.96 (-1.52%)
HUMNL 13.80 Decreased By ▼ -0.06 (-0.43%)
KEL 4.69 Decreased By ▼ -0.17 (-3.5%)
KOSM 6.38 Decreased By ▼ -0.55 (-7.94%)
MLCF 42.20 Decreased By ▼ -1.43 (-3.28%)
OGDC 213.01 Increased By ▲ 0.06 (0.03%)
PACE 7.20 Decreased By ▼ -0.02 (-0.28%)
PAEL 40.45 Decreased By ▼ -0.72 (-1.75%)
PIAHCLA 16.81 Decreased By ▼ -0.02 (-0.12%)
PIBTL 8.29 Decreased By ▼ -0.34 (-3.94%)
POWER 8.84 Increased By ▲ 0.03 (0.34%)
PPL 183.00 Decreased By ▼ -0.03 (-0.02%)
PRL 38.08 Decreased By ▼ -1.55 (-3.91%)
PTC 23.99 Decreased By ▼ -0.74 (-2.99%)
SEARL 93.41 Decreased By ▼ -4.60 (-4.69%)
SILK 1.00 Decreased By ▼ -0.01 (-0.99%)
SSGC 39.99 Decreased By ▼ -1.74 (-4.17%)
SYM 18.35 Decreased By ▼ -0.51 (-2.7%)
TELE 8.64 Decreased By ▼ -0.36 (-4%)
TPLP 12.06 Decreased By ▼ -0.34 (-2.74%)
TRG 64.05 Decreased By ▼ -1.63 (-2.48%)
WAVESAPP 10.40 Decreased By ▼ -0.58 (-5.28%)
WTL 1.78 Decreased By ▼ -0.01 (-0.56%)
YOUW 4.00 Decreased By ▼ -0.03 (-0.74%)
BR100 11,733 Decreased By -133.2 (-1.12%)
BR30 35,368 Decreased By -328.7 (-0.92%)
KSE100 112,595 Decreased By -1553.8 (-1.36%)
KSE30 35,411 Decreased By -541.4 (-1.51%)

President Pakistan Businessmen and Intellectuals Forum (PBIF), Mian Zahid Hussain has said that the government failed to pay attention to the transmission, distribution and billing system. Feeders usually trip frequently creating problems for masses and the economy; therefore, this sector should be improved.
He said energy situation is improving in the country despite prolonged circular debt. The government settled the infamous circular debt soon after assuming power with a promise that the issue has been buried forever which proved otherwise, he said.
The debt resurfaced soon but government pressed with the plan to establish new power projects and completed forty-seven big and small projects since 2013 improving production capacity by 8694 megawatts, he added. Mian Zahid said that the government completed ten power production projects in 2013; seven more projects became functional in 2014 followed by six power projects in 2015.
Ten projects were completed in 2016 and fourteen during the last year which included LNG-based, coal-fired and nuclear power projects. Few big projects would be completed in the ongoing year of 2018 which will improve power generation capacity but weak transmission and distribution system will pose a serious threat to the situation.

Copyright Business Recorder, 2018

Comments

Comments are closed.