AIRLINK 192.46 Decreased By ▼ -3.92 (-2%)
BOP 10.23 Increased By ▲ 0.12 (1.19%)
CNERGY 7.53 Decreased By ▼ -0.22 (-2.84%)
FCCL 38.10 No Change ▼ 0.00 (0%)
FFL 15.41 Decreased By ▼ -0.33 (-2.1%)
FLYNG 24.82 Increased By ▲ 0.28 (1.14%)
HUBC 128.08 Decreased By ▼ -2.30 (-1.76%)
HUMNL 13.77 Increased By ▲ 0.04 (0.29%)
KEL 4.44 Decreased By ▼ -0.16 (-3.48%)
KOSM 6.21 Increased By ▲ 0.02 (0.32%)
MLCF 44.62 Decreased By ▼ -0.23 (-0.51%)
OGDC 202.69 Decreased By ▼ -3.82 (-1.85%)
PACE 6.63 Increased By ▲ 0.05 (0.76%)
PAEL 37.95 Decreased By ▼ -1.82 (-4.58%)
PIAHCLA 17.01 Decreased By ▼ -0.19 (-1.1%)
PIBTL 7.84 Decreased By ▼ -0.15 (-1.88%)
POWER 9.40 Increased By ▲ 0.20 (2.17%)
PPL 175.05 Decreased By ▼ -3.86 (-2.16%)
PRL 37.34 Decreased By ▼ -1.59 (-4.08%)
PTC 23.45 Decreased By ▼ -0.86 (-3.54%)
SEARL 104.89 Decreased By ▼ -4.38 (-4.01%)
SILK 1.01 Increased By ▲ 0.01 (1%)
SSGC 36.90 Decreased By ▼ -0.85 (-2.25%)
SYM 18.26 Decreased By ▼ -0.57 (-3.03%)
TELE 8.27 Decreased By ▼ -0.26 (-3.05%)
TPLP 12.13 Decreased By ▼ -0.01 (-0.08%)
TRG 63.98 Decreased By ▼ -0.78 (-1.2%)
WAVESAPP 11.72 Decreased By ▼ -0.39 (-3.22%)
WTL 1.63 Decreased By ▼ -0.01 (-0.61%)
YOUW 3.89 Increased By ▲ 0.02 (0.52%)
BR100 11,856 Decreased By -143.8 (-1.2%)
BR30 34,973 Decreased By -575 (-1.62%)
KSE100 112,745 Decreased By -1510.7 (-1.32%)
KSE30 35,360 Decreased By -509.9 (-1.42%)

National Engineering Services Pakistan (NESPAK) private limited attained another milestone in the hydropower sector by winning a project titled "409 MW Torcamp Godubar Hydropower Project" through competitive bidding. Pakhtunkhwa Energy Development Organization (PEDO) entrusted the Project to a joint venture of NESPAK (Lead Firm), FICHTNER GmbH & Co. KG, Germany (Foreign JV partner) in association with TRS (Pvt.) Limited, Lahore. Dr Tahir M. Hayat, Managing Director NESPAK along with Zafar Aman (Project Manager), Chief Engineer, GT&GE Division represented NESPAK at the contract signing ceremony held at PEDO House in Peshawar.
According to the spokesperson of the NESPAK the Project is located in Chitral District of Khyber Pakhtunkhwa. The scope of work includes feasibility study, detailed engineering design, preparation of tender documents and PC-I. The duration of the project is 24 months.
It is also an honor for NESPAK that the Company has been rendering engineering consultancy services for various projects of national importance like Orange Line Metro Train Project in Lahore, Neelum Jhelum Hydroelectric Power Project and RLNG-based Combined Cycle Power Projects in Punjab.
On the overseas front, NESPAK has won the Raising Wala Dam Project in Jordan, Rural Access and Mobility Project II in Nigeria and High Voltage Projects in Saudi Arabia.

Copyright Business Recorder, 2018

Comments

Comments are closed.