AIRLINK 196.50 Increased By ▲ 2.94 (1.52%)
BOP 10.25 Increased By ▲ 0.30 (3.02%)
CNERGY 7.88 Decreased By ▼ -0.05 (-0.63%)
FCCL 39.80 Decreased By ▼ -0.85 (-2.09%)
FFL 17.09 Increased By ▲ 0.23 (1.36%)
FLYNG 27.12 Decreased By ▼ -0.63 (-2.27%)
HUBC 133.95 Increased By ▲ 1.37 (1.03%)
HUMNL 14.10 Increased By ▲ 0.21 (1.51%)
KEL 4.78 Increased By ▲ 0.18 (3.91%)
KOSM 6.64 Increased By ▲ 0.02 (0.3%)
MLCF 47.18 Decreased By ▼ -0.42 (-0.88%)
OGDC 214.79 Increased By ▲ 0.88 (0.41%)
PACE 6.96 Increased By ▲ 0.03 (0.43%)
PAEL 42.00 Increased By ▲ 0.76 (1.84%)
PIAHCLA 17.15 No Change ▼ 0.00 (0%)
PIBTL 8.50 Increased By ▲ 0.09 (1.07%)
POWER 9.60 Decreased By ▼ -0.04 (-0.41%)
PPL 183.96 Increased By ▲ 1.61 (0.88%)
PRL 42.90 Increased By ▲ 0.94 (2.24%)
PTC 25.15 Increased By ▲ 0.25 (1%)
SEARL 109.80 Increased By ▲ 2.96 (2.77%)
SILK 1.00 Increased By ▲ 0.01 (1.01%)
SSGC 44.11 Increased By ▲ 4.01 (10%)
SYM 17.86 Increased By ▲ 0.39 (2.23%)
TELE 8.96 Increased By ▲ 0.12 (1.36%)
TPLP 13.06 Increased By ▲ 0.31 (2.43%)
TRG 67.60 Increased By ▲ 0.65 (0.97%)
WAVESAPP 11.68 Increased By ▲ 0.35 (3.09%)
WTL 1.83 Increased By ▲ 0.04 (2.23%)
YOUW 3.97 Decreased By ▼ -0.10 (-2.46%)
BR100 12,249 Increased By 204.5 (1.7%)
BR30 36,933 Increased By 352.6 (0.96%)
KSE100 115,674 Increased By 1636.6 (1.44%)
KSE30 36,396 Increased By 602.1 (1.68%)

National Engineering Services Pakistan (NESPAK) private limited attained another milestone in the hydropower sector by winning a project titled "409 MW Torcamp Godubar Hydropower Project" through competitive bidding. Pakhtunkhwa Energy Development Organization (PEDO) entrusted the Project to a joint venture of NESPAK (Lead Firm), FICHTNER GmbH & Co. KG, Germany (Foreign JV partner) in association with TRS (Pvt.) Limited, Lahore. Dr Tahir M. Hayat, Managing Director NESPAK along with Zafar Aman (Project Manager), Chief Engineer, GT&GE Division represented NESPAK at the contract signing ceremony held at PEDO House in Peshawar.
According to the spokesperson of the NESPAK the Project is located in Chitral District of Khyber Pakhtunkhwa. The scope of work includes feasibility study, detailed engineering design, preparation of tender documents and PC-I. The duration of the project is 24 months.
It is also an honor for NESPAK that the Company has been rendering engineering consultancy services for various projects of national importance like Orange Line Metro Train Project in Lahore, Neelum Jhelum Hydroelectric Power Project and RLNG-based Combined Cycle Power Projects in Punjab.
On the overseas front, NESPAK has won the Raising Wala Dam Project in Jordan, Rural Access and Mobility Project II in Nigeria and High Voltage Projects in Saudi Arabia.

Copyright Business Recorder, 2018

Comments

Comments are closed.