AIRLINK 200.02 Increased By ▲ 6.46 (3.34%)
BOP 10.23 Increased By ▲ 0.28 (2.81%)
CNERGY 7.83 Decreased By ▼ -0.10 (-1.26%)
FCCL 40.00 Decreased By ▼ -0.65 (-1.6%)
FFL 16.80 Decreased By ▼ -0.06 (-0.36%)
FLYNG 26.50 Decreased By ▼ -1.25 (-4.5%)
HUBC 132.79 Increased By ▲ 0.21 (0.16%)
HUMNL 13.99 Increased By ▲ 0.10 (0.72%)
KEL 4.67 Increased By ▲ 0.07 (1.52%)
KOSM 6.57 Decreased By ▼ -0.05 (-0.76%)
MLCF 46.66 Decreased By ▼ -0.94 (-1.97%)
OGDC 211.89 Decreased By ▼ -2.02 (-0.94%)
PACE 6.89 Decreased By ▼ -0.04 (-0.58%)
PAEL 41.34 Increased By ▲ 0.10 (0.24%)
PIAHCLA 17.02 Decreased By ▼ -0.13 (-0.76%)
PIBTL 8.13 Decreased By ▼ -0.28 (-3.33%)
POWER 9.37 Decreased By ▼ -0.27 (-2.8%)
PPL 181.45 Decreased By ▼ -0.90 (-0.49%)
PRL 41.60 Decreased By ▼ -0.36 (-0.86%)
PTC 24.69 Decreased By ▼ -0.21 (-0.84%)
SEARL 112.25 Increased By ▲ 5.41 (5.06%)
SILK 1.00 Increased By ▲ 0.01 (1.01%)
SSGC 44.00 Increased By ▲ 3.90 (9.73%)
SYM 19.18 Increased By ▲ 1.71 (9.79%)
TELE 8.91 Increased By ▲ 0.07 (0.79%)
TPLP 12.90 Increased By ▲ 0.15 (1.18%)
TRG 67.40 Increased By ▲ 0.45 (0.67%)
WAVESAPP 11.45 Increased By ▲ 0.12 (1.06%)
WTL 1.78 Decreased By ▼ -0.01 (-0.56%)
YOUW 4.00 Decreased By ▼ -0.07 (-1.72%)
BR100 12,170 Increased By 125.6 (1.04%)
BR30 36,589 Increased By 8.6 (0.02%)
KSE100 114,880 Increased By 842.7 (0.74%)
KSE30 36,125 Increased By 330.6 (0.92%)

Prime Minister Shahid Khaqan Abbasi on Saturday inaugurated 1410 MW Tarbela 4th extension hydropower project. President Azad Jammu & Kashmir Sardar Masood Khan, Governor Khyber Pakhtunkhwa Iqbal Zafar Jhagra, Minister for Water Resources Syed Javed Ali Shah, Minister of State for Information Maryum Aurangzeb and Chinese Ambassador Yao Jing accompanied the Prime Minister.
First unit of 470 MW will be commissioned today, while as two more units each with equal power generating capacity will be online before the advent of summer this year. Commissioning of Tarbela 4th Extension Hydropower Project is yet another historic milestone achieved by the government to add 1410 MW in the national grid.
The T-4 project will play a pivotal role in balancing energy mix of the country and stabilizing prices of electricity for a long span in future with an attractive economic rate of return of more than 30 percent and annual cost sale of $300 million to national exchequer.
Tarbela Dam is located on the Indus River about 100 km northwest of Islamabad. The T-4 project is located within premises of existing Tarbela Dam Project. Tarbela Dam Project, completed in 1976, has provision of 5 tunnels, four on Left Bank and one on Right Bank. Tunnels 1-3 have installed capacity of 3,478 MW with average annual energy generation of 15-16 billion units.
The T-4 project will generate 3.84 billion units annually, equivalent of burning of 1 million ton of furnace oil. Newly installed units of T-4 project are more efficient and it is expected to have 10 -15% more energy through these units.

Copyright Business Recorder, 2018

Comments

Comments are closed.