AIRLINK 192.46 Decreased By ▼ -3.92 (-2%)
BOP 10.23 Increased By ▲ 0.12 (1.19%)
CNERGY 7.53 Decreased By ▼ -0.22 (-2.84%)
FCCL 38.10 No Change ▼ 0.00 (0%)
FFL 15.41 Decreased By ▼ -0.33 (-2.1%)
FLYNG 24.82 Increased By ▲ 0.28 (1.14%)
HUBC 128.08 Decreased By ▼ -2.30 (-1.76%)
HUMNL 13.77 Increased By ▲ 0.04 (0.29%)
KEL 4.44 Decreased By ▼ -0.16 (-3.48%)
KOSM 6.21 Increased By ▲ 0.02 (0.32%)
MLCF 44.62 Decreased By ▼ -0.23 (-0.51%)
OGDC 202.69 Decreased By ▼ -3.82 (-1.85%)
PACE 6.63 Increased By ▲ 0.05 (0.76%)
PAEL 37.95 Decreased By ▼ -1.82 (-4.58%)
PIAHCLA 17.01 Decreased By ▼ -0.19 (-1.1%)
PIBTL 7.84 Decreased By ▼ -0.15 (-1.88%)
POWER 9.40 Increased By ▲ 0.20 (2.17%)
PPL 175.05 Decreased By ▼ -3.86 (-2.16%)
PRL 37.34 Decreased By ▼ -1.59 (-4.08%)
PTC 23.45 Decreased By ▼ -0.86 (-3.54%)
SEARL 104.89 Decreased By ▼ -4.38 (-4.01%)
SILK 1.01 Increased By ▲ 0.01 (1%)
SSGC 36.90 Decreased By ▼ -0.85 (-2.25%)
SYM 18.26 Decreased By ▼ -0.57 (-3.03%)
TELE 8.27 Decreased By ▼ -0.26 (-3.05%)
TPLP 12.13 Decreased By ▼ -0.01 (-0.08%)
TRG 63.98 Decreased By ▼ -0.78 (-1.2%)
WAVESAPP 11.72 Decreased By ▼ -0.39 (-3.22%)
WTL 1.63 Decreased By ▼ -0.01 (-0.61%)
YOUW 3.89 Increased By ▲ 0.02 (0.52%)
BR100 11,856 Decreased By -143.8 (-1.2%)
BR30 34,973 Decreased By -575 (-1.62%)
KSE100 112,745 Decreased By -1510.7 (-1.32%)
KSE30 35,360 Decreased By -509.9 (-1.42%)

A sub-sea gas pipeline linking Finland and Estonia moved closer to reality on Thursday as the two EU members signed a construction deal on the project intended to ease the region's dependence on Russian gas. Estonia's electricity and gas system operator Elering and Finnish state company Baltic Connector OY contracted the Swiss-based Allseas Group S.A. to build the sub-sea section of Balticconnector pipeline, Elering said in a statement. Planned to be in use by 2020, the pipeline is meant to link Finland to the EU's common energy market while also reducing its dependence on gas imports from powerful neighbour Russia, currently its only gas supplier.
The overall cost of the project is around 300 million euros ($370 million), with 206 million euros provided by the European Union. The Baltic states' heavy dependence on Russian gas was partly reduced in January 2015, when Lithuania broke the Russian monopoly on gas deliveries by launching its first floating LNG terminal in the port of Klaipeda.
Russia's 2014 annexation of Ukraine's Crimean peninsula prompted the EU to speed up its plans to cut dependence on Russian gas.

Copyright Agence France-Presse, 2018

Comments

Comments are closed.