AIRLINK 196.50 Increased By ▲ 2.94 (1.52%)
BOP 10.25 Increased By ▲ 0.30 (3.02%)
CNERGY 7.88 Decreased By ▼ -0.05 (-0.63%)
FCCL 39.80 Decreased By ▼ -0.85 (-2.09%)
FFL 17.09 Increased By ▲ 0.23 (1.36%)
FLYNG 27.12 Decreased By ▼ -0.63 (-2.27%)
HUBC 133.95 Increased By ▲ 1.37 (1.03%)
HUMNL 14.10 Increased By ▲ 0.21 (1.51%)
KEL 4.78 Increased By ▲ 0.18 (3.91%)
KOSM 6.64 Increased By ▲ 0.02 (0.3%)
MLCF 47.18 Decreased By ▼ -0.42 (-0.88%)
OGDC 214.79 Increased By ▲ 0.88 (0.41%)
PACE 6.96 Increased By ▲ 0.03 (0.43%)
PAEL 42.00 Increased By ▲ 0.76 (1.84%)
PIAHCLA 17.15 No Change ▼ 0.00 (0%)
PIBTL 8.50 Increased By ▲ 0.09 (1.07%)
POWER 9.60 Decreased By ▼ -0.04 (-0.41%)
PPL 183.96 Increased By ▲ 1.61 (0.88%)
PRL 42.90 Increased By ▲ 0.94 (2.24%)
PTC 25.15 Increased By ▲ 0.25 (1%)
SEARL 109.80 Increased By ▲ 2.96 (2.77%)
SILK 1.00 Increased By ▲ 0.01 (1.01%)
SSGC 44.11 Increased By ▲ 4.01 (10%)
SYM 17.86 Increased By ▲ 0.39 (2.23%)
TELE 8.96 Increased By ▲ 0.12 (1.36%)
TPLP 13.06 Increased By ▲ 0.31 (2.43%)
TRG 67.60 Increased By ▲ 0.65 (0.97%)
WAVESAPP 11.68 Increased By ▲ 0.35 (3.09%)
WTL 1.83 Increased By ▲ 0.04 (2.23%)
YOUW 3.97 Decreased By ▼ -0.10 (-2.46%)
BR100 12,249 Increased By 204.5 (1.7%)
BR30 36,933 Increased By 352.6 (0.96%)
KSE100 115,663 Increased By 1625.1 (1.43%)
KSE30 36,398 Increased By 603.9 (1.69%)

A sub-sea gas pipeline linking Finland and Estonia moved closer to reality on Thursday as the two EU members signed a construction deal on the project intended to ease the region's dependence on Russian gas. Estonia's electricity and gas system operator Elering and Finnish state company Baltic Connector OY contracted the Swiss-based Allseas Group S.A. to build the sub-sea section of Balticconnector pipeline, Elering said in a statement. Planned to be in use by 2020, the pipeline is meant to link Finland to the EU's common energy market while also reducing its dependence on gas imports from powerful neighbour Russia, currently its only gas supplier.
The overall cost of the project is around 300 million euros ($370 million), with 206 million euros provided by the European Union. The Baltic states' heavy dependence on Russian gas was partly reduced in January 2015, when Lithuania broke the Russian monopoly on gas deliveries by launching its first floating LNG terminal in the port of Klaipeda.
Russia's 2014 annexation of Ukraine's Crimean peninsula prompted the EU to speed up its plans to cut dependence on Russian gas.

Copyright Agence France-Presse, 2018

Comments

Comments are closed.