AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 127.04 No Change ▼ 0.00 (0%)
BOP 6.67 No Change ▼ 0.00 (0%)
CNERGY 4.51 No Change ▼ 0.00 (0%)
DCL 8.55 No Change ▼ 0.00 (0%)
DFML 41.44 No Change ▼ 0.00 (0%)
DGKC 86.85 No Change ▼ 0.00 (0%)
FCCL 32.28 No Change ▼ 0.00 (0%)
FFBL 64.80 No Change ▼ 0.00 (0%)
FFL 10.25 No Change ▼ 0.00 (0%)
HUBC 109.57 No Change ▼ 0.00 (0%)
HUMNL 14.68 No Change ▼ 0.00 (0%)
KEL 5.05 No Change ▼ 0.00 (0%)
KOSM 7.46 No Change ▼ 0.00 (0%)
MLCF 41.38 No Change ▼ 0.00 (0%)
NBP 60.41 No Change ▼ 0.00 (0%)
OGDC 190.10 No Change ▼ 0.00 (0%)
PAEL 27.83 No Change ▼ 0.00 (0%)
PIBTL 7.83 No Change ▼ 0.00 (0%)
PPL 150.06 No Change ▼ 0.00 (0%)
PRL 26.88 No Change ▼ 0.00 (0%)
PTC 16.07 No Change ▼ 0.00 (0%)
SEARL 86.00 No Change ▼ 0.00 (0%)
TELE 7.71 No Change ▼ 0.00 (0%)
TOMCL 35.41 No Change ▼ 0.00 (0%)
TPLP 8.12 No Change ▼ 0.00 (0%)
TREET 16.41 No Change ▼ 0.00 (0%)
TRG 53.29 No Change ▼ 0.00 (0%)
UNITY 26.16 No Change ▼ 0.00 (0%)
WTL 1.26 No Change ▼ 0.00 (0%)
BR100 9,980 Increased By 96.5 (0.98%)
BR30 30,916 Increased By 316.4 (1.03%)
KSE100 94,103 Increased By 747.6 (0.8%)
KSE30 29,147 Increased By 216.5 (0.75%)

Pakistan Petroleum Limited (PPL), operator of Adhi Field, together with its joint venture partners Oil and Gas Development Company Limited and Pakistan Oilfields Limited, commenced first oil production from well Adhi South X-1, a recent oil and gas discovery located in Rawalpindi District, Punjab.
Adhi South X-1 was drilled to target depth of 3395 metres, resulting in discovery of oil from Khewra and condensate from Tobra sandstone reservoirs. After discovery and subsequent rig release on February 20, 2018, construction work was carried out to tie in the well to Adhi LPG/NGL Plant-III, following which it was commissioned on April 24, 2018 within eight weeks of discovery, setting a record in well commissioning time for PPL. Adhi South X-1 well is currently flowing from Khewra formation only at choke size 48/64" and well-head flowing pressure of 1100 psig. Currently, well production rates are around 1300 BOPD oil and 2mmscfd gas, which is expected to gradually scale up to 1800 BOPD and6MMscfd, respectively.-PR

Copyright Business Recorder, 2018

Comments

Comments are closed.