AGL 40.51 Increased By ▲ 0.48 (1.2%)
AIRLINK 127.70 No Change ▼ 0.00 (0%)
BOP 6.71 Increased By ▲ 0.10 (1.51%)
CNERGY 4.47 Decreased By ▼ -0.13 (-2.83%)
DCL 8.90 Increased By ▲ 0.11 (1.25%)
DFML 41.47 Decreased By ▼ -0.11 (-0.26%)
DGKC 86.31 Increased By ▲ 0.52 (0.61%)
FCCL 32.60 Increased By ▲ 0.11 (0.34%)
FFBL 64.82 Increased By ▲ 0.79 (1.23%)
FFL 11.61 Increased By ▲ 1.06 (10.05%)
HUBC 113.12 Increased By ▲ 2.35 (2.12%)
HUMNL 14.87 Decreased By ▼ -0.20 (-1.33%)
KEL 5.07 Increased By ▲ 0.19 (3.89%)
KOSM 7.35 Decreased By ▼ -0.10 (-1.34%)
MLCF 40.65 Increased By ▲ 0.13 (0.32%)
NBP 61.30 Increased By ▲ 0.25 (0.41%)
OGDC 196.27 Increased By ▲ 1.40 (0.72%)
PAEL 26.95 Decreased By ▼ -0.56 (-2.04%)
PIBTL 7.31 Decreased By ▼ -0.50 (-6.4%)
PPL 154.08 Increased By ▲ 1.55 (1.02%)
PRL 26.31 Decreased By ▼ -0.27 (-1.02%)
PTC 16.20 Decreased By ▼ -0.06 (-0.37%)
SEARL 88.50 Increased By ▲ 4.36 (5.18%)
TELE 7.76 Decreased By ▼ -0.20 (-2.51%)
TOMCL 36.21 Decreased By ▼ -0.39 (-1.07%)
TPLP 8.85 Increased By ▲ 0.19 (2.19%)
TREET 16.65 Decreased By ▼ -1.01 (-5.72%)
TRG 62.51 Increased By ▲ 3.89 (6.64%)
UNITY 28.60 Increased By ▲ 1.74 (6.48%)
WTL 1.35 Decreased By ▼ -0.03 (-2.17%)
BR100 10,137 Increased By 137.1 (1.37%)
BR30 31,420 Increased By 417.8 (1.35%)
KSE100 95,108 Increased By 916.5 (0.97%)
KSE30 29,552 Increased By 350.8 (1.2%)

London's new Crossrail train line, the biggest infrastructure project in Europe which was set to operate through the capital's heart from December, has been postponed until late 2019, its chief executive said Friday. The Elizabeth Line, decades in the planning and making, and set to add 10 percent to central London's creaking rail capacity, will now open in the third quarter of 2019, Crossrail boss Simon Wright announced.
"We have made huge progress with the delivery of this incredible project but we need further time to complete the testing of the new railway," he said in a statement.
The 73-mile (118-kilometre) east-west railway line, with two branches at either end, is costing £15.4 billion ($20 billion, 17 billion euros) to build.
It will bring an extra 1.5 million people to within 45 minutes of central London and more than 200 million passengers are expected to use it every year.
"The revised schedule is needed to complete the final infrastructure and extensive testing required to ensure the Elizabeth Line opens as a safe and reliable railway," according to Crossrail.

Copyright Agence France-Presse, 2018

Comments

Comments are closed.