AIRLINK 196.38 Increased By ▲ 4.54 (2.37%)
BOP 10.11 Increased By ▲ 0.24 (2.43%)
CNERGY 7.75 Increased By ▲ 0.08 (1.04%)
FCCL 38.10 Increased By ▲ 0.24 (0.63%)
FFL 15.74 Decreased By ▼ -0.02 (-0.13%)
FLYNG 24.54 Decreased By ▼ -0.77 (-3.04%)
HUBC 130.38 Increased By ▲ 0.21 (0.16%)
HUMNL 13.73 Increased By ▲ 0.14 (1.03%)
KEL 4.60 Decreased By ▼ -0.07 (-1.5%)
KOSM 6.19 Decreased By ▼ -0.02 (-0.32%)
MLCF 44.85 Increased By ▲ 0.56 (1.26%)
OGDC 206.51 Decreased By ▼ -0.36 (-0.17%)
PACE 6.58 Increased By ▲ 0.02 (0.3%)
PAEL 39.77 Decreased By ▼ -0.78 (-1.92%)
PIAHCLA 17.20 Decreased By ▼ -0.39 (-2.22%)
PIBTL 7.99 Decreased By ▼ -0.08 (-0.99%)
POWER 9.20 Decreased By ▼ -0.04 (-0.43%)
PPL 178.91 Increased By ▲ 0.35 (0.2%)
PRL 38.93 Decreased By ▼ -0.15 (-0.38%)
PTC 24.31 Increased By ▲ 0.17 (0.7%)
SEARL 109.27 Increased By ▲ 1.42 (1.32%)
SILK 1.00 Increased By ▲ 0.03 (3.09%)
SSGC 37.75 Decreased By ▼ -1.36 (-3.48%)
SYM 18.83 Decreased By ▼ -0.29 (-1.52%)
TELE 8.53 Decreased By ▼ -0.07 (-0.81%)
TPLP 12.14 Decreased By ▼ -0.23 (-1.86%)
TRG 64.76 Decreased By ▼ -1.25 (-1.89%)
WAVESAPP 12.11 Decreased By ▼ -0.67 (-5.24%)
WTL 1.64 Decreased By ▼ -0.06 (-3.53%)
YOUW 3.87 Decreased By ▼ -0.08 (-2.03%)
BR100 12,000 Increased By 69.2 (0.58%)
BR30 35,548 Decreased By -112 (-0.31%)
KSE100 114,256 Increased By 1049.3 (0.93%)
KSE30 35,870 Increased By 304.3 (0.86%)

The 1320MW coal-fired power plant of the China Power Hub Generation Company (Pvt.) Ltd, being constructed in Hub, Balochistan, has achieved a major milestone by interconnecting with Pakistan's National Grid, subsequently achieving back energization of its 500KV GIS from Jamshoro side of the transmission lines.
With this achievement, CPHGC has officially entered into Hot Commissioning phase of the complex that would lead to synchronization of its 1st Unit with the National Grid in December 2018.
The process of power back-feeding was completed after a series of key steps such as line connection, site acceptance tests, high pressure test of GIS, injection test and inter tripping test all witnessed by relevant regulatory authorities.
The whole operation was completed safely and all the parameters of the relevant grid equipment were found within normal limits.
After energizing the 500KV system, CPHGC has achieved energization of start-up transformer and 10 kV auxiliary power system, and preparing for the system commissioning of Unit 1.
The milestone was achieved in collaboration with the production and technology departments of CPHGC and National Transmission & Dispatch Company. Speaking on the occasion, Zhao Yonggang, CEO, CPHGC thanked the officials of the NTDC and said he looks forward to the continued support of the NTDC.
"The achievement of this major milestone also indicates that we are on track on meeting the deadline of August 2019 for the COD".
Zhao Yonggang said that CPHGC is a prime example of the bonds of friendship that exist between Pakistan and China. Here the Chinese and the Pakistanis are working together to help alleviate the problem of electricity shortage that will go a long way in helping to strengthen the Pakistan's economy.

Copyright Business Recorder, 2018

Comments

Comments are closed.