AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 129.06 Decreased By ▼ -0.47 (-0.36%)
BOP 6.75 Increased By ▲ 0.07 (1.05%)
CNERGY 4.49 Decreased By ▼ -0.14 (-3.02%)
DCL 8.55 Decreased By ▼ -0.39 (-4.36%)
DFML 40.82 Decreased By ▼ -0.87 (-2.09%)
DGKC 80.96 Decreased By ▼ -2.81 (-3.35%)
FCCL 32.77 No Change ▼ 0.00 (0%)
FFBL 74.43 Decreased By ▼ -1.04 (-1.38%)
FFL 11.74 Increased By ▲ 0.27 (2.35%)
HUBC 109.58 Decreased By ▼ -0.97 (-0.88%)
HUMNL 13.75 Decreased By ▼ -0.81 (-5.56%)
KEL 5.31 Decreased By ▼ -0.08 (-1.48%)
KOSM 7.72 Decreased By ▼ -0.68 (-8.1%)
MLCF 38.60 Decreased By ▼ -1.19 (-2.99%)
NBP 63.51 Increased By ▲ 3.22 (5.34%)
OGDC 194.69 Decreased By ▼ -4.97 (-2.49%)
PAEL 25.71 Decreased By ▼ -0.94 (-3.53%)
PIBTL 7.39 Decreased By ▼ -0.27 (-3.52%)
PPL 155.45 Decreased By ▼ -2.47 (-1.56%)
PRL 25.79 Decreased By ▼ -0.94 (-3.52%)
PTC 17.50 Decreased By ▼ -0.96 (-5.2%)
SEARL 78.65 Decreased By ▼ -3.79 (-4.6%)
TELE 7.86 Decreased By ▼ -0.45 (-5.42%)
TOMCL 33.73 Decreased By ▼ -0.78 (-2.26%)
TPLP 8.40 Decreased By ▼ -0.66 (-7.28%)
TREET 16.27 Decreased By ▼ -1.20 (-6.87%)
TRG 58.22 Decreased By ▼ -3.10 (-5.06%)
UNITY 27.49 Increased By ▲ 0.06 (0.22%)
WTL 1.39 Increased By ▲ 0.01 (0.72%)
BR100 10,445 Increased By 38.5 (0.37%)
BR30 31,189 Decreased By -523.9 (-1.65%)
KSE100 97,798 Increased By 469.8 (0.48%)
KSE30 30,481 Increased By 288.3 (0.95%)

Government of Pakistan and Asian Development Bank on Thursday signed a loan and a grant agreement amounting to $284 million (Loan 3677 for $280 million and Grant for $4 million) from ADB''s Ordinary Capital Resources and High-Level Technology Fund for the Second Power Transmission Enhancement Investment Program- Tranche-3. Noor Ahmed, Secretary, Economic Affairs Division (EAD) signed the Loan Agreement with Xiaohong Yang, Country Director, ADB, says a press release issued here.
The National Transmission and Despatch Company (NTDC) is the implementing agency of the Tranche-3 Project under the existing Multi-tranche Financing Facility amounting to $810 million. Certain components of the investment program will be implemented by Central Power Purchasing Agency (Guarantee) Limited (CPPA-G) including certain capacity components, as set out in the legal agreement for each tranche.
The project objective is to attain improved coverage, reliability, transparency and quality of the power transmission service in the project areas. The project shall comprise of the; (i) Construction of 500/220/132 kV Lahore North substation with six 500 kV line bays, six 220 kV line bays, and two 132 kV line bays, including installation of four 750 MVA, 500/220 kV and three 250 MVA, 220/132 kV transformers along with allied equipment and accessories; (ii) installation of approximately 194 km of associated double circuit transmission lines;(iii) construction of 500 kV switching station at Maira with 8 line bays and 4 shunt reactor banks along with allied equipment and ccessories; (iv) construction of the 220 kV substation at Jauharabad with four 220 kV line bays and eight 132 kV line bays, including installation of three 160 MVA, 230/132 kV transformers along with allied equipment and accessories; (v) Installation of lithium-ion battery packs (5 MWh); (vi) installation of balance of system including inverters (20MW).
The impact of Tranche-3 is improved transmission infrastructure and improved energy market transparency whereas the outcome of Tranche-3 is improved coverage reliability, transparency and quality of the power transmission service in Project areas.
The project is expected to be completed by 30th June 2023. The project when completed is expected to address some critical bottlenecks in distribution system of NTDC and will facilitate uninterrupted and reliable supply of electricity of 1150 MW in project area.-PR

Copyright Business Recorder, 2018

Comments

Comments are closed.