AGL 37.99 Decreased By ▼ -0.03 (-0.08%)
AIRLINK 215.53 Increased By ▲ 18.17 (9.21%)
BOP 9.80 Increased By ▲ 0.26 (2.73%)
CNERGY 6.79 Increased By ▲ 0.88 (14.89%)
DCL 9.17 Increased By ▲ 0.35 (3.97%)
DFML 38.96 Increased By ▲ 3.22 (9.01%)
DGKC 100.25 Increased By ▲ 3.39 (3.5%)
FCCL 36.70 Increased By ▲ 1.45 (4.11%)
FFBL 88.94 No Change ▼ 0.00 (0%)
FFL 14.49 Increased By ▲ 1.32 (10.02%)
HUBC 134.13 Increased By ▲ 6.58 (5.16%)
HUMNL 13.63 Increased By ▲ 0.13 (0.96%)
KEL 5.69 Increased By ▲ 0.37 (6.95%)
KOSM 7.32 Increased By ▲ 0.32 (4.57%)
MLCF 45.87 Increased By ▲ 1.17 (2.62%)
NBP 61.28 Decreased By ▼ -0.14 (-0.23%)
OGDC 232.59 Increased By ▲ 17.92 (8.35%)
PAEL 40.73 Increased By ▲ 1.94 (5%)
PIBTL 8.58 Increased By ▲ 0.33 (4%)
PPL 203.34 Increased By ▲ 10.26 (5.31%)
PRL 40.81 Increased By ▲ 2.15 (5.56%)
PTC 28.31 Increased By ▲ 2.51 (9.73%)
SEARL 108.51 Increased By ▲ 4.91 (4.74%)
TELE 8.74 Increased By ▲ 0.44 (5.3%)
TOMCL 35.83 Increased By ▲ 0.83 (2.37%)
TPLP 13.84 Increased By ▲ 0.54 (4.06%)
TREET 24.38 Increased By ▲ 2.22 (10.02%)
TRG 61.15 Increased By ▲ 5.56 (10%)
UNITY 34.84 Increased By ▲ 1.87 (5.67%)
WTL 1.72 Increased By ▲ 0.12 (7.5%)
BR100 12,244 Increased By 517.6 (4.41%)
BR30 38,419 Increased By 2042.6 (5.62%)
KSE100 113,924 Increased By 4411.3 (4.03%)
KSE30 36,044 Increased By 1530.5 (4.43%)

Chief Minister Khyber Pakhtunkhwa Mahmood Khan has directed for the accelerated execution of hydel power generation projects in the province. His government would set up a separate model institution for the CPEC related projects in the province.
Chashma Lift Irrigation Scheme will become a life-vein for the agriculture productivity and self-sufficiency in food requirements of the province and would boost agro economy in the province, therefore he directed to speed up work on the CRBC. He also directed to get approval Environmental Protection Agency (EPA) for 36 Mega Watt Dral, 17 Mega Watt Ranolia, 2.6 Mega Watt Machia.
He was presiding over a meeting at Chief Minister Secretariat Peshawar. Advisor to CM on Energy Hamayatullah Khan, Head of strategic Support Unit Sahibzada Saeed, Secretary Energy & Power, Commissioner Peshawar and other relevant officers also attended.
The Chief Minister asked the departments to own their projects and ensure timely completion of these projects. The importance of CPEC should not be overshadowed by other consideration therefore CPEC would be the focus of our all times attention. He directed to continue working on CPEC related projects round the clock as we have to work harder for the growth in all sectors in the province.
The Chief Minister directed for the early execution and timely completion of hydro power generation projects in order to strengthen the economic base of the province. His government wanted the province to get sustained economic growth in order to ensure that the "province stands on its own feet".
He was optimistic to generate maximum resources out of mineral, tourism, agriculture production, hydel power generation, cottage industry and other productive sectors. He directed the relevant quarter to prepare a report on the Swat Cascade.
The chief minister gave guidelines for the use of electricity to be generated through hydel power projects in the province for the industrialization within the province on cheap prices that will attract mass scale investment and in the process this province would record mass scale investment, industrialization, jobs creation and overall prosperity.

Copyright Business Recorder, 2019

Comments

Comments are closed.