AIRLINK 196.38 Increased By ▲ 4.54 (2.37%)
BOP 10.11 Increased By ▲ 0.24 (2.43%)
CNERGY 7.75 Increased By ▲ 0.08 (1.04%)
FCCL 38.10 Increased By ▲ 0.24 (0.63%)
FFL 15.74 Decreased By ▼ -0.02 (-0.13%)
FLYNG 24.54 Decreased By ▼ -0.77 (-3.04%)
HUBC 130.38 Increased By ▲ 0.21 (0.16%)
HUMNL 13.73 Increased By ▲ 0.14 (1.03%)
KEL 4.60 Decreased By ▼ -0.07 (-1.5%)
KOSM 6.19 Decreased By ▼ -0.02 (-0.32%)
MLCF 44.85 Increased By ▲ 0.56 (1.26%)
OGDC 206.51 Decreased By ▼ -0.36 (-0.17%)
PACE 6.58 Increased By ▲ 0.02 (0.3%)
PAEL 39.77 Decreased By ▼ -0.78 (-1.92%)
PIAHCLA 17.20 Decreased By ▼ -0.39 (-2.22%)
PIBTL 7.99 Decreased By ▼ -0.08 (-0.99%)
POWER 9.20 Decreased By ▼ -0.04 (-0.43%)
PPL 178.91 Increased By ▲ 0.35 (0.2%)
PRL 38.93 Decreased By ▼ -0.15 (-0.38%)
PTC 24.31 Increased By ▲ 0.17 (0.7%)
SEARL 109.27 Increased By ▲ 1.42 (1.32%)
SILK 1.00 Increased By ▲ 0.03 (3.09%)
SSGC 37.75 Decreased By ▼ -1.36 (-3.48%)
SYM 18.83 Decreased By ▼ -0.29 (-1.52%)
TELE 8.53 Decreased By ▼ -0.07 (-0.81%)
TPLP 12.14 Decreased By ▼ -0.23 (-1.86%)
TRG 64.76 Decreased By ▼ -1.25 (-1.89%)
WAVESAPP 12.11 Decreased By ▼ -0.67 (-5.24%)
WTL 1.64 Decreased By ▼ -0.06 (-3.53%)
YOUW 3.87 Decreased By ▼ -0.08 (-2.03%)
BR100 12,000 Increased By 69.2 (0.58%)
BR30 35,548 Decreased By -112 (-0.31%)
KSE100 114,256 Increased By 1049.3 (0.93%)
KSE30 35,870 Increased By 304.3 (0.86%)

Chief Minister Khyber Pakhtunkhwa Mahmood Khan has directed for the accelerated execution of hydel power generation projects in the province. His government would set up a separate model institution for the CPEC related projects in the province.
Chashma Lift Irrigation Scheme will become a life-vein for the agriculture productivity and self-sufficiency in food requirements of the province and would boost agro economy in the province, therefore he directed to speed up work on the CRBC. He also directed to get approval Environmental Protection Agency (EPA) for 36 Mega Watt Dral, 17 Mega Watt Ranolia, 2.6 Mega Watt Machia.
He was presiding over a meeting at Chief Minister Secretariat Peshawar. Advisor to CM on Energy Hamayatullah Khan, Head of strategic Support Unit Sahibzada Saeed, Secretary Energy & Power, Commissioner Peshawar and other relevant officers also attended.
The Chief Minister asked the departments to own their projects and ensure timely completion of these projects. The importance of CPEC should not be overshadowed by other consideration therefore CPEC would be the focus of our all times attention. He directed to continue working on CPEC related projects round the clock as we have to work harder for the growth in all sectors in the province.
The Chief Minister directed for the early execution and timely completion of hydro power generation projects in order to strengthen the economic base of the province. His government wanted the province to get sustained economic growth in order to ensure that the "province stands on its own feet".
He was optimistic to generate maximum resources out of mineral, tourism, agriculture production, hydel power generation, cottage industry and other productive sectors. He directed the relevant quarter to prepare a report on the Swat Cascade.
The chief minister gave guidelines for the use of electricity to be generated through hydel power projects in the province for the industrialization within the province on cheap prices that will attract mass scale investment and in the process this province would record mass scale investment, industrialization, jobs creation and overall prosperity.

Copyright Business Recorder, 2019

Comments

Comments are closed.