AGL 38.40 Decreased By ▼ -0.08 (-0.21%)
AIRLINK 186.55 Decreased By ▼ -16.47 (-8.11%)
BOP 9.36 Decreased By ▼ -0.81 (-7.96%)
CNERGY 5.81 Decreased By ▼ -0.73 (-11.16%)
DCL 8.80 Decreased By ▼ -0.78 (-8.14%)
DFML 36.19 Decreased By ▼ -3.83 (-9.57%)
DGKC 92.50 Decreased By ▼ -5.58 (-5.69%)
FCCL 34.40 Decreased By ▼ -0.56 (-1.6%)
FFBL 82.01 Decreased By ▼ -4.42 (-5.11%)
FFL 12.54 Decreased By ▼ -1.36 (-9.78%)
HUBC 120.60 Decreased By ▼ -10.97 (-8.34%)
HUMNL 13.30 Decreased By ▼ -0.72 (-5.14%)
KEL 5.06 Decreased By ▼ -0.55 (-9.8%)
KOSM 7.02 Decreased By ▼ -0.25 (-3.44%)
MLCF 42.32 Decreased By ▼ -3.27 (-7.17%)
NBP 59.90 Decreased By ▼ -6.48 (-9.76%)
OGDC 210.25 Decreased By ▼ -10.51 (-4.76%)
PAEL 36.30 Decreased By ▼ -2.18 (-5.67%)
PIBTL 8.05 Decreased By ▼ -0.86 (-9.65%)
PPL 187.50 Decreased By ▼ -10.38 (-5.25%)
PRL 37.20 Decreased By ▼ -1.83 (-4.69%)
PTC 23.50 Decreased By ▼ -1.97 (-7.73%)
SEARL 100.47 Decreased By ▼ -2.58 (-2.5%)
TELE 8.13 Decreased By ▼ -0.89 (-9.87%)
TOMCL 35.00 Decreased By ▼ -1.41 (-3.87%)
TPLP 13.50 Decreased By ▼ -0.25 (-1.82%)
TREET 22.61 Decreased By ▼ -2.51 (-9.99%)
TRG 52.50 Decreased By ▼ -5.54 (-9.55%)
UNITY 32.55 Decreased By ▼ -1.12 (-3.33%)
WTL 1.51 Decreased By ▼ -0.20 (-11.7%)
BR100 11,416 Decreased By -474.2 (-3.99%)
BR30 35,281 Decreased By -2075.5 (-5.56%)
KSE100 106,154 Decreased By -4916.1 (-4.43%)
KSE30 33,328 Decreased By -1581 (-4.53%)

Reon Energy Limited has started work on 10MW captive Solar Power Project for Eni New Energy Pakistan near Bhit gas field in Sindh. The 10MW photovoltaic project is expected to produce approximately 20GWh (gigawatt hours) annually. The project is likely
to be completed by October 2019. Reon Energy CEO Mujtaba Haider Khan said that the project had a strategic importance for the country as it saves gas currently being used for on-site power generation.
"The 10MW Photovoltaic project will secure an additional energy source for Eni New Energy Pakistan," he said, adding that the output energy would be used on site, reducing gas consumption and avoiding around 140.000 tonnes of CO2 equivalent emissions in the next 10 years.
It is aimed at integrating the new photovoltaic project with the existing power generating facility. Once operational, it will allow the shutdown of one of the existing gas turbines and resultantly cut down operational costs.

Copyright Business Recorder, 2019

Comments

Comments are closed.