AIRLINK 194.83 Decreased By ▼ -3.14 (-1.59%)
BOP 9.81 Decreased By ▼ -0.23 (-2.29%)
CNERGY 7.36 Increased By ▲ 0.07 (0.96%)
FCCL 38.58 Increased By ▲ 2.58 (7.17%)
FFL 16.45 Decreased By ▼ -0.46 (-2.72%)
FLYNG 27.54 Increased By ▲ 2.50 (9.98%)
HUBC 131.75 Decreased By ▼ -2.28 (-1.7%)
HUMNL 13.86 Decreased By ▼ -0.28 (-1.98%)
KEL 4.66 Decreased By ▼ -0.12 (-2.51%)
KOSM 6.66 Decreased By ▼ -0.28 (-4.03%)
MLCF 45.39 Increased By ▲ 0.41 (0.91%)
OGDC 213.99 Decreased By ▼ -4.24 (-1.94%)
PACE 6.86 Decreased By ▼ -0.08 (-1.15%)
PAEL 40.06 Decreased By ▼ -1.36 (-3.28%)
PIAHCLA 16.79 Decreased By ▼ -0.07 (-0.42%)
PIBTL 8.32 Decreased By ▼ -0.14 (-1.65%)
POWER 9.43 Increased By ▲ 0.04 (0.43%)
PPL 182.19 Decreased By ▼ -3.74 (-2.01%)
PRL 41.83 Increased By ▲ 0.56 (1.36%)
PTC 24.56 Decreased By ▼ -0.21 (-0.85%)
SEARL 102.53 Decreased By ▼ -2.12 (-2.03%)
SILK 1.00 Decreased By ▼ -0.01 (-0.99%)
SSGC 39.44 Decreased By ▼ -1.47 (-3.59%)
SYM 17.33 Decreased By ▼ -0.72 (-3.99%)
TELE 8.76 Decreased By ▼ -0.15 (-1.68%)
TPLP 12.75 Decreased By ▼ -0.09 (-0.7%)
TRG 65.40 Decreased By ▼ -1.20 (-1.8%)
WAVESAPP 11.11 Decreased By ▼ -0.19 (-1.68%)
WTL 1.70 Decreased By ▼ -0.08 (-4.49%)
YOUW 3.94 Decreased By ▼ -0.06 (-1.5%)
BR100 11,988 Decreased By -121.3 (-1%)
BR30 36,198 Decreased By -400.2 (-1.09%)
KSE100 113,443 Decreased By -1598.8 (-1.39%)
KSE30 35,635 Decreased By -564.3 (-1.56%)

SSGC strongly denies a misleading statement that has been communicated by K-Electric to the media stating that the shortage of gas supply has impacted its power generation, leading to temporary load shedding in many areas of Karachi.
SSGC would like to bring on record that gas supply to K-Electric has not been reduced rather the gas utility is providing additional 10-15 mmcfd of natural gas to KE. Against KE's demand of 190 mmcfd, SSGC is providing 210 mmcfd gas on a monthly average basis to the power company, only in the best interest of Karachites who are experiencing scorching heat nowadays.
SSGC also rejects the baseless claim of KE for supplying low pressure gas to the power utility as it is supplying gas with full pressure to all four power plants of KE. To Bin Qasim Power Plant SSGC is supplying 140 mmcfd at 104 psi, to Korangi Creek Power Plant commonly known as Combine Cycle Plant, SSGC is providing 26 mmcfd gas at 55 psi, to Korangi Industrial Area Power Plant SSGC is supplying 12 mmcfd gas at 35 psi whereas to the SITE Area Sher Shah Power Plant SSGC is providing 14 mmcfd gas at 30 psi.-PR

Copyright Business Recorder, 2019

Comments

Comments are closed.