AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

SSGC strongly denies a misleading statement that has been communicated by K-Electric to the media stating that the shortage of gas supply has impacted its power generation, leading to temporary load shedding in many areas of Karachi.
SSGC would like to bring on record that gas supply to K-Electric has not been reduced rather the gas utility is providing additional 10-15 mmcfd of natural gas to KE. Against KE's demand of 190 mmcfd, SSGC is providing 210 mmcfd gas on a monthly average basis to the power company, only in the best interest of Karachites who are experiencing scorching heat nowadays.
SSGC also rejects the baseless claim of KE for supplying low pressure gas to the power utility as it is supplying gas with full pressure to all four power plants of KE. To Bin Qasim Power Plant SSGC is supplying 140 mmcfd at 104 psi, to Korangi Creek Power Plant commonly known as Combine Cycle Plant, SSGC is providing 26 mmcfd gas at 55 psi, to Korangi Industrial Area Power Plant SSGC is supplying 12 mmcfd gas at 35 psi whereas to the SITE Area Sher Shah Power Plant SSGC is providing 14 mmcfd gas at 30 psi.-PR

Copyright Business Recorder, 2019

Comments

Comments are closed.