AIRLINK 196.38 Increased By ▲ 4.54 (2.37%)
BOP 10.11 Increased By ▲ 0.24 (2.43%)
CNERGY 7.75 Increased By ▲ 0.08 (1.04%)
FCCL 38.10 Increased By ▲ 0.24 (0.63%)
FFL 15.74 Decreased By ▼ -0.02 (-0.13%)
FLYNG 24.54 Decreased By ▼ -0.77 (-3.04%)
HUBC 130.38 Increased By ▲ 0.21 (0.16%)
HUMNL 13.73 Increased By ▲ 0.14 (1.03%)
KEL 4.60 Decreased By ▼ -0.07 (-1.5%)
KOSM 6.19 Decreased By ▼ -0.02 (-0.32%)
MLCF 44.85 Increased By ▲ 0.56 (1.26%)
OGDC 206.51 Decreased By ▼ -0.36 (-0.17%)
PACE 6.58 Increased By ▲ 0.02 (0.3%)
PAEL 39.77 Decreased By ▼ -0.78 (-1.92%)
PIAHCLA 17.20 Decreased By ▼ -0.39 (-2.22%)
PIBTL 7.99 Decreased By ▼ -0.08 (-0.99%)
POWER 9.20 Decreased By ▼ -0.04 (-0.43%)
PPL 178.91 Increased By ▲ 0.35 (0.2%)
PRL 38.93 Decreased By ▼ -0.15 (-0.38%)
PTC 24.31 Increased By ▲ 0.17 (0.7%)
SEARL 109.27 Increased By ▲ 1.42 (1.32%)
SILK 1.00 Increased By ▲ 0.03 (3.09%)
SSGC 37.75 Decreased By ▼ -1.36 (-3.48%)
SYM 18.83 Decreased By ▼ -0.29 (-1.52%)
TELE 8.53 Decreased By ▼ -0.07 (-0.81%)
TPLP 12.14 Decreased By ▼ -0.23 (-1.86%)
TRG 64.76 Decreased By ▼ -1.25 (-1.89%)
WAVESAPP 12.11 Decreased By ▼ -0.67 (-5.24%)
WTL 1.64 Decreased By ▼ -0.06 (-3.53%)
YOUW 3.87 Decreased By ▼ -0.08 (-2.03%)
BR100 12,000 Increased By 69.2 (0.58%)
BR30 35,548 Decreased By -112 (-0.31%)
KSE100 114,256 Increased By 1049.3 (0.93%)
KSE30 35,870 Increased By 304.3 (0.86%)

ISLAMABAD: The Petroleum Division and TAPI Pipeline Corporation are in the process of completing the essential documentation for timely execution of Turkmenistan-Afghanistan-Pakistan-India (TAPI) gas pipeline project.

“In near future, the Petroleum Division and TAPI Pipeline will sign an essential document. Under the project, Pakistan will receive around 1300 million cubic feet gas to meet its energy requirements,” an official source privy to the project told APP.

He said Petroleum Minister Ghulam Sarwar Khan and Turkmen ambassador to Pakistan Atadjan Movlamov had recently discussed the project under which around 1,680-kilometer trans-country gas pipeline would be laid. Turkmenistan has completed the construction of gas pipeline in its section, following which a groundbreaking ceremony was performed in February last year at the Turkmen border city of Serhetabat to take the pipeline to Afghanistan.

On Pakistan side, the gas pipeline would be laid from Chaman to Multan via Quetta and Dera Ismail Khan.

The TAPI Pipeline Company Limited (TPCL), the consortium leader, has expressed the desire to hold an inaugural ceremony in March 2019, in Pakistan, inviting head of states of all four countries, they said.

Commenting on progress made on the project so far in Pakistan, he said Technical Consultant of the project had been appointed and the Front End Engineering and Design (FEED) had been completed.

Under the project, the official said, a 56-inch diameter 1,680 kilometers pipeline, having capacity to flow 3.2 billion cubic feet per day (bcfd) gas, would be laid from Turkmenistan through Afghanistan and Pakistan up to Pak-India border by the year 2020.

Copyright APP (Associated Press of Pakistan), 2019

Comments

Comments are closed.