AIRLINK 189.36 Increased By ▲ 1.33 (0.71%)
BOP 11.10 Decreased By ▼ -0.76 (-6.41%)
CNERGY 7.28 Decreased By ▼ -0.26 (-3.45%)
FCCL 36.65 Decreased By ▼ -1.14 (-3.02%)
FFL 14.95 Decreased By ▼ -0.29 (-1.9%)
FLYNG 26.19 Increased By ▲ 0.66 (2.59%)
HUBC 130.89 Increased By ▲ 0.74 (0.57%)
HUMNL 13.47 Decreased By ▼ -0.14 (-1.03%)
KEL 4.28 Decreased By ▼ -0.07 (-1.61%)
KOSM 6.08 Decreased By ▼ -0.09 (-1.46%)
MLCF 45.94 Increased By ▲ 0.26 (0.57%)
OGDC 201.86 Decreased By ▼ -4.57 (-2.21%)
PACE 6.12 Decreased By ▼ -0.26 (-4.08%)
PAEL 38.36 Decreased By ▼ -1.95 (-4.84%)
PIAHCLA 16.73 Decreased By ▼ -0.22 (-1.3%)
PIBTL 7.94 Decreased By ▼ -0.09 (-1.12%)
POWER 9.86 Decreased By ▼ -0.17 (-1.69%)
PPL 173.46 Decreased By ▼ -5.38 (-3.01%)
PRL 34.73 Decreased By ▼ -1.63 (-4.48%)
PTC 23.95 Decreased By ▼ -0.44 (-1.8%)
SEARL 101.74 Decreased By ▼ -1.42 (-1.38%)
SILK 1.07 No Change ▼ 0.00 (0%)
SSGC 32.70 Decreased By ▼ -3.54 (-9.77%)
SYM 17.93 Decreased By ▼ -0.30 (-1.65%)
TELE 8.14 Decreased By ▼ -0.24 (-2.86%)
TPLP 12.02 Decreased By ▼ -0.14 (-1.15%)
TRG 67.40 Increased By ▲ 0.07 (0.1%)
WAVESAPP 11.80 Decreased By ▼ -0.21 (-1.75%)
WTL 1.52 Decreased By ▼ -0.05 (-3.18%)
YOUW 3.90 Increased By ▲ 0.01 (0.26%)
BR100 11,819 Decreased By -87.9 (-0.74%)
BR30 35,000 Decreased By -554.1 (-1.56%)
KSE100 112,085 Decreased By -478.8 (-0.43%)
KSE30 34,946 Decreased By -148 (-0.42%)

Pengerang Refining and Petrochemical (PrefChem), a joint venture between Petronas and Saudi Aramco, has begun to restart a crude distillation unit (CDU) at its oil refinery in Malaysia, Petronas said on Saturday. Malaysia's state oil firm said the refinery had started feeding crude oil into the unit earlier this week, confirming an earlier Reuters report citing sources.
"We confirm that the refinery has started feeding crude to its CDU earlier this week in efforts to restart the plant," Petronas told Reuters over email. The Pengerang Refining development, part of Petronas' $27 billion Pengerang Integrated Complex, consists of a 300,000 barrels-per-day (bpd) oil refinery and a petrochemical complex with a production capacity of 7.7 million tonnes per year in the southern Malaysian state of Johor.
The project, originally known as RAPID, or Refinery and Petrochemical Integrated Development, was shut in April after a fire damaged its atmospheric residue desulphurisation (ARDS) unit. It had been scheduled to restart last month but that was pushed back to August, they said. Repairs at the ARDS unit were expected to take months so the refinery has modified the type of crude it processes to low-sulphur oil such as Murban crude from Abu Dhabi, the sources said.

Copyright Reuters, 2019

Comments

Comments are closed.