AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 132.66 Increased By ▲ 3.13 (2.42%)
BOP 6.89 Increased By ▲ 0.21 (3.14%)
CNERGY 4.57 Decreased By ▼ -0.06 (-1.3%)
DCL 8.92 Decreased By ▼ -0.02 (-0.22%)
DFML 42.75 Increased By ▲ 1.06 (2.54%)
DGKC 84.00 Increased By ▲ 0.23 (0.27%)
FCCL 32.90 Increased By ▲ 0.13 (0.4%)
FFBL 77.06 Increased By ▲ 1.59 (2.11%)
FFL 12.20 Increased By ▲ 0.73 (6.36%)
HUBC 110.01 Decreased By ▼ -0.54 (-0.49%)
HUMNL 14.40 Decreased By ▼ -0.16 (-1.1%)
KEL 5.53 Increased By ▲ 0.14 (2.6%)
KOSM 8.32 Decreased By ▼ -0.08 (-0.95%)
MLCF 39.67 Decreased By ▼ -0.12 (-0.3%)
NBP 65.50 Increased By ▲ 5.21 (8.64%)
OGDC 198.74 Decreased By ▼ -0.92 (-0.46%)
PAEL 26.00 Decreased By ▼ -0.65 (-2.44%)
PIBTL 7.62 Decreased By ▼ -0.04 (-0.52%)
PPL 159.00 Increased By ▲ 1.08 (0.68%)
PRL 26.24 Decreased By ▼ -0.49 (-1.83%)
PTC 18.35 Decreased By ▼ -0.11 (-0.6%)
SEARL 82.24 Decreased By ▼ -0.20 (-0.24%)
TELE 8.12 Decreased By ▼ -0.19 (-2.29%)
TOMCL 34.40 Decreased By ▼ -0.11 (-0.32%)
TPLP 8.98 Decreased By ▼ -0.08 (-0.88%)
TREET 16.88 Decreased By ▼ -0.59 (-3.38%)
TRG 59.49 Decreased By ▼ -1.83 (-2.98%)
UNITY 27.52 Increased By ▲ 0.09 (0.33%)
WTL 1.40 Increased By ▲ 0.02 (1.45%)
BR100 10,614 Increased By 206.9 (1.99%)
BR30 31,874 Increased By 160.5 (0.51%)
KSE100 98,972 Increased By 1644 (1.69%)
KSE30 30,784 Increased By 591.7 (1.96%)

An 8-member delegation of M/s CREEC Locomotives and Rolling Stock Design Engineers of China concluded its week-long visit of Karachi Division Saturday by holding a meeting with the Divisional Superintendent (DC), Pakistan Railways Karachi Syed Mazhar Ali Shah.
The group visited maintenance and rolling stock facilities within the Karachi division, extending from Karachi to Tando Adam, that entailed locomotive workshop and Shed, MYP and Port Qasim, C&W shops Hyderabad, Sick Lines in Kotri, Coaching, Washing and goods sick lines, a press release said here.
The CPEC- based ML-1 project would enhance the traffic capacity by 5 times to that of the current capacity thereby highlighting the need of upgrading the existing maintenance capacity. The ML-1, being defined as the life blood of Pakistan Railways in the coming years, requires a holistic modernisation of railways infrastructure, automation wherever required, so that synchronisation could take place between the CPEC-based project and railway infrastructure.
The new outlook of Pakistan Railways under the ML-1 project would be expected to ramp up the responsibility of carrying the number of passengers and tonnes of freight per day. The DS Railways gave an overview of the Pakistan Railways priorities which are envisioned under up-gradation in view of ML-1.

Copyright Associated Press of Pakistan, 2019

Comments

Comments are closed.