AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)

An 8-member delegation of M/s CREEC Locomotives and Rolling Stock Design Engineers of China concluded its week-long visit of Karachi Division Saturday by holding a meeting with the Divisional Superintendent (DC), Pakistan Railways Karachi Syed Mazhar Ali Shah.
The group visited maintenance and rolling stock facilities within the Karachi division, extending from Karachi to Tando Adam, that entailed locomotive workshop and Shed, MYP and Port Qasim, C&W shops Hyderabad, Sick Lines in Kotri, Coaching, Washing and goods sick lines, a press release said here.
The CPEC- based ML-1 project would enhance the traffic capacity by 5 times to that of the current capacity thereby highlighting the need of upgrading the existing maintenance capacity. The ML-1, being defined as the life blood of Pakistan Railways in the coming years, requires a holistic modernisation of railways infrastructure, automation wherever required, so that synchronisation could take place between the CPEC-based project and railway infrastructure.
The new outlook of Pakistan Railways under the ML-1 project would be expected to ramp up the responsibility of carrying the number of passengers and tonnes of freight per day. The DS Railways gave an overview of the Pakistan Railways priorities which are envisioned under up-gradation in view of ML-1.

Copyright Associated Press of Pakistan, 2019

Comments

Comments are closed.