AGL 38.02 Increased By ▲ 0.08 (0.21%)
AIRLINK 197.36 Increased By ▲ 3.45 (1.78%)
BOP 9.54 Increased By ▲ 0.22 (2.36%)
CNERGY 5.91 Increased By ▲ 0.07 (1.2%)
DCL 8.82 Increased By ▲ 0.14 (1.61%)
DFML 35.74 Decreased By ▼ -0.72 (-1.97%)
DGKC 96.86 Increased By ▲ 4.32 (4.67%)
FCCL 35.25 Increased By ▲ 1.28 (3.77%)
FFBL 88.94 Increased By ▲ 6.64 (8.07%)
FFL 13.17 Increased By ▲ 0.42 (3.29%)
HUBC 127.55 Increased By ▲ 6.94 (5.75%)
HUMNL 13.50 Decreased By ▼ -0.10 (-0.74%)
KEL 5.32 Increased By ▲ 0.10 (1.92%)
KOSM 7.00 Increased By ▲ 0.48 (7.36%)
MLCF 44.70 Increased By ▲ 2.59 (6.15%)
NBP 61.42 Increased By ▲ 1.61 (2.69%)
OGDC 214.67 Increased By ▲ 3.50 (1.66%)
PAEL 38.79 Increased By ▲ 1.21 (3.22%)
PIBTL 8.25 Increased By ▲ 0.18 (2.23%)
PPL 193.08 Increased By ▲ 2.76 (1.45%)
PRL 38.66 Increased By ▲ 0.49 (1.28%)
PTC 25.80 Increased By ▲ 2.35 (10.02%)
SEARL 103.60 Increased By ▲ 5.66 (5.78%)
TELE 8.30 Increased By ▲ 0.08 (0.97%)
TOMCL 35.00 Decreased By ▼ -0.03 (-0.09%)
TPLP 13.30 Decreased By ▼ -0.25 (-1.85%)
TREET 22.16 Decreased By ▼ -0.57 (-2.51%)
TRG 55.59 Increased By ▲ 2.72 (5.14%)
UNITY 32.97 Increased By ▲ 0.01 (0.03%)
WTL 1.60 Increased By ▲ 0.08 (5.26%)
BR100 11,727 Increased By 342.7 (3.01%)
BR30 36,377 Increased By 1165.1 (3.31%)
KSE100 109,513 Increased By 3238.2 (3.05%)
KSE30 34,513 Increased By 1160.1 (3.48%)
Pakistan

Meeting reviews progress work on 46 energy projects in KP

PESHAWAR: A meeting of the Energy and Power Department here Thursday reviewed annual development plan of the departm
Published March 7, 2019

PESHAWAR: A meeting of the Energy and Power Department here Thursday reviewed annual development plan of the department and obtained briefing on 46 different hydropower projects underway in the Khyber Pakthunkhwa province.

Advisor to the chief minister on Power and Energy Hamayatullah Khan chaired the meeting which was also attended by secretary energy and power Engr Sarfaraz Durrani, Additional Secretary Zafarul Islam, Chief Executive Officer PEDO, Zainullah Khan, General Manager Bahadar Shah and Project Directors of hydropower projects.

The meeting held detailed deliberations on 46 hydropower projects including 35 ongoing and 11 new projects.

The PEDO chief briefed the meeting in details about expenditure and generation capacity of the projects which included hydropower projects Shangla, Growcan Hydropower Project Swat, 40MW hydropower project Lower Dir, 69MW under construction project Chitral and some projects in Mansehra.

The advisor Hayatullah Khan said Khyber Pakhtunkhwa government was completing electricity and energy projects on fast track and therefore no leniency would be tolerated in this regard.

Secretary Energy and Power Engr Sarfarz said monitoring and evolution system would be further strengthened so that performance on various projects could easily ascertained.

Copyright APP (Associated Press of Pakistan), 2019

Comments

Comments are closed.