AGL 38.15 Decreased By ▼ -1.43 (-3.61%)
AIRLINK 125.07 Decreased By ▼ -6.15 (-4.69%)
BOP 6.85 Increased By ▲ 0.04 (0.59%)
CNERGY 4.45 Decreased By ▼ -0.26 (-5.52%)
DCL 7.91 Decreased By ▼ -0.53 (-6.28%)
DFML 37.34 Decreased By ▼ -4.13 (-9.96%)
DGKC 77.77 Decreased By ▼ -4.32 (-5.26%)
FCCL 30.58 Decreased By ▼ -2.52 (-7.61%)
FFBL 68.86 Decreased By ▼ -4.01 (-5.5%)
FFL 11.86 Decreased By ▼ -0.40 (-3.26%)
HUBC 104.50 Decreased By ▼ -6.24 (-5.63%)
HUMNL 13.49 Decreased By ▼ -1.02 (-7.03%)
KEL 4.65 Decreased By ▼ -0.54 (-10.4%)
KOSM 7.17 Decreased By ▼ -0.44 (-5.78%)
MLCF 36.44 Decreased By ▼ -2.46 (-6.32%)
NBP 65.92 Increased By ▲ 1.91 (2.98%)
OGDC 179.53 Decreased By ▼ -13.29 (-6.89%)
PAEL 24.43 Decreased By ▼ -1.25 (-4.87%)
PIBTL 7.15 Decreased By ▼ -0.19 (-2.59%)
PPL 143.70 Decreased By ▼ -10.37 (-6.73%)
PRL 24.32 Decreased By ▼ -1.51 (-5.85%)
PTC 16.40 Decreased By ▼ -1.41 (-7.92%)
SEARL 78.57 Decreased By ▼ -3.73 (-4.53%)
TELE 7.22 Decreased By ▼ -0.54 (-6.96%)
TOMCL 31.97 Decreased By ▼ -1.49 (-4.45%)
TPLP 8.13 Decreased By ▼ -0.36 (-4.24%)
TREET 16.13 Decreased By ▼ -0.49 (-2.95%)
TRG 54.66 Decreased By ▼ -2.74 (-4.77%)
UNITY 27.50 Decreased By ▼ -0.01 (-0.04%)
WTL 1.29 Decreased By ▼ -0.08 (-5.84%)
BR100 10,089 Decreased By -415.2 (-3.95%)
BR30 29,509 Decreased By -1717.6 (-5.5%)
KSE100 94,574 Decreased By -3505.6 (-3.57%)
KSE30 29,445 Decreased By -1113.9 (-3.65%)

MULTAN: Multan Electric Power Company (Mepco) has completed 50 low tension (LT) schemes during June 2019, to provide new connections and upgradation of the system.

The schemes have been completed at a cost of over Rs 26.6 million.

Additional Chief Engineer Construction MEPCO Sardar said that as per directives of CEO Mepco Engineer Tahir Mahmood, High Tension (HT) and low tension (LT) schemes were being completed across the region on top priority to improvement of the system.

He said that two LT schemes have been completed in Multan circle, one in Bahawalnager, one in Bahawalpur, 13 in DG Khan, 7 in Khanewal, 11 in Rahimyar Khan, 2 in Sahiwal, 2 in Vehari and 5 LT schemes have been completed in Muzaffargarh circle.

Copyright APP (Associated Press of Pakistan), 2019

Comments

Comments are closed.