AGL 37.99 Decreased By ▼ -0.03 (-0.08%)
AIRLINK 215.53 Increased By ▲ 18.17 (9.21%)
BOP 9.80 Increased By ▲ 0.26 (2.73%)
CNERGY 6.79 Increased By ▲ 0.88 (14.89%)
DCL 9.17 Increased By ▲ 0.35 (3.97%)
DFML 38.96 Increased By ▲ 3.22 (9.01%)
DGKC 100.25 Increased By ▲ 3.39 (3.5%)
FCCL 36.70 Increased By ▲ 1.45 (4.11%)
FFBL 88.94 No Change ▼ 0.00 (0%)
FFL 14.49 Increased By ▲ 1.32 (10.02%)
HUBC 134.13 Increased By ▲ 6.58 (5.16%)
HUMNL 13.63 Increased By ▲ 0.13 (0.96%)
KEL 5.69 Increased By ▲ 0.37 (6.95%)
KOSM 7.32 Increased By ▲ 0.32 (4.57%)
MLCF 45.87 Increased By ▲ 1.17 (2.62%)
NBP 61.28 Decreased By ▼ -0.14 (-0.23%)
OGDC 232.59 Increased By ▲ 17.92 (8.35%)
PAEL 40.73 Increased By ▲ 1.94 (5%)
PIBTL 8.58 Increased By ▲ 0.33 (4%)
PPL 203.34 Increased By ▲ 10.26 (5.31%)
PRL 40.81 Increased By ▲ 2.15 (5.56%)
PTC 28.31 Increased By ▲ 2.51 (9.73%)
SEARL 108.51 Increased By ▲ 4.91 (4.74%)
TELE 8.74 Increased By ▲ 0.44 (5.3%)
TOMCL 35.83 Increased By ▲ 0.83 (2.37%)
TPLP 13.84 Increased By ▲ 0.54 (4.06%)
TREET 24.38 Increased By ▲ 2.22 (10.02%)
TRG 61.15 Increased By ▲ 5.56 (10%)
UNITY 34.84 Increased By ▲ 1.87 (5.67%)
WTL 1.72 Increased By ▲ 0.12 (7.5%)
BR100 12,244 Increased By 517.6 (4.41%)
BR30 38,419 Increased By 2042.6 (5.62%)
KSE100 113,924 Increased By 4411.3 (4.03%)
KSE30 36,044 Increased By 1530.5 (4.43%)

The energy sector complexities in contracts and its mismanagement are cascading not only across the energy chain, but could also have adverse implications in totally different sectors. Recent line packing of gas supply is not going to be a one off issue, as poor planning of the past regime and bad management of incumbents are drying the benefits to be accrued of better hydel flows, new efficient plants and cheaper fuel options.

The improvement and gains to be attained due to better snowfall last year, more rains this season, new hydel generation options, movement to cheaper fuels like coal and having better efficient power plants are not going be accrued; and the higher capacity payments related to new plants and RLNG terminals may haunt to slowdown the economic recovery process.

The current issue of energy management started a few months back when furnace oil was unnecessarily imported, and later weather forecast was not considered in importing RLNG. The higher import of fuel versus less consumption of electricity is resulting in cutting down domestic production of cheap gas; no thanks to poor planning by incumbents and unreasonable ‘take or pay’ contracts by the predecessors.

The problem of gas pipeline system packing was highlighted in this space couple of weeks back (for details read ‘Energy mess to get messier’, published on 6th August, 2019). The situation is messier today. The higher import of FO resulted in less use of RLNG power plants as the consumption of energy came down due to economic slowdown, better water availability, and induction of new alternate power generation sources.

That has resulted in SNGPL and SSGC lines packing beyond optimal limits. It has some adverse consequences – curtailment of indigenous gas fields as against optimal pressure of 800-1000 PSI, the pressure is around 1100 PSI in some sections. The lower domestic production is for replacement of higher imported RLNG to oblige term contract ‘take or pay’ of 800 mmcfd, and that is in addition to average three spot cargos per month.

The need is to re-gasify around 1 bcfd while the firm demand by power sector is of 450 mmcfd for Sep19. The puzzle is how to deploy 350-550 mmcfd RLNG at $11.35/mmbtu without any subsidy. The other problem is that higher import bill has to be paid as domestic cheap gas is to be replaced by imported one.

The utmost need is proper planning of RLNG use. The money saved on demurrages is wasted on opportunity cost of not using local gas. The pressing requirement is to create RLNG storage. A discourse is required to develop on RLNG storage, and proper execution of energy ministry. It is action time!

Copyright Business Recorder, 2019

Comments

Comments are closed.