AIRLINK 164.00 Decreased By ▼ -1.36 (-0.82%)
BOP 10.58 Increased By ▲ 0.19 (1.83%)
CNERGY 8.40 Increased By ▲ 0.57 (7.28%)
FCCL 47.24 Increased By ▲ 1.59 (3.48%)
FFL 15.30 Increased By ▲ 0.18 (1.19%)
FLYNG 26.45 Decreased By ▼ -0.03 (-0.11%)
HUBC 137.19 Increased By ▲ 1.91 (1.41%)
HUMNL 12.99 Increased By ▲ 0.14 (1.09%)
KEL 4.30 Increased By ▲ 0.11 (2.63%)
KOSM 5.63 Increased By ▲ 0.16 (2.93%)
MLCF 60.80 Increased By ▲ 1.37 (2.31%)
OGDC 215.60 Increased By ▲ 2.53 (1.19%)
PACE 5.54 Increased By ▲ 0.13 (2.4%)
PAEL 41.89 Decreased By ▼ -0.12 (-0.29%)
PIAHCLA 17.65 Increased By ▲ 0.60 (3.52%)
PIBTL 10.22 Increased By ▲ 0.29 (2.92%)
POWER 11.88 Increased By ▲ 0.09 (0.76%)
PPL 174.68 Decreased By ▼ -0.11 (-0.06%)
PRL 35.65 Increased By ▲ 1.29 (3.75%)
PTC 22.95 Increased By ▲ 0.25 (1.1%)
SEARL 95.08 Increased By ▲ 1.33 (1.42%)
SSGC 36.47 Increased By ▲ 0.36 (1%)
SYM 14.00 Increased By ▲ 0.52 (3.86%)
TELE 7.27 Increased By ▲ 0.15 (2.11%)
TPLP 10.25 Increased By ▲ 0.04 (0.39%)
TRG 61.93 Increased By ▲ 1.00 (1.64%)
WAVESAPP 10.39 Increased By ▲ 0.11 (1.07%)
WTL 1.31 Increased By ▲ 0.03 (2.34%)
YOUW 3.72 Increased By ▲ 0.02 (0.54%)
BR100 12,388 Increased By 74.4 (0.6%)
BR30 36,995 Increased By 487.9 (1.34%)
KSE100 115,532 Increased By 623 (0.54%)
KSE30 35,662 Increased By 120.4 (0.34%)
Markets

China's CNOOC aims to trial LNG shipments through trains

CNOOC will send LNG from the Guangxi, Zhuhai, Zhejiang and Tianjin LNG terminals to central China via trains.
Published October 15, 2019
  • CNOOC will send LNG from the Guangxi, Zhuhai, Zhejiang and Tianjin LNG terminals to central China via trains.
  • It is aiming to transport 1 million tonnes per year of LNG through so-called ISO tank containers.

BEIJING|: The gas and power group of China National Offshore Oil Corp(CNOOC) is working with a rail company to ship liquefied natural gas (LNG) through small LNG containers in trains on a trial basis, a senior company executive said on Tuesday.

During the two-year trial, CNOOC will send LNG from the Guangxi, Zhuhai, Zhejiang and Tianjin LNG terminals to central China via trains, said Wang Si, head of the company's LNG ISO Tank Container Intermodal Transport project.

It is aiming to transport 1 million tonnes per year of LNG through so-called ISO tank containers, over 2019-2021, increasing this to 2 mtpa (metric tonnes per annum) by 2022-2023, he added.

Comments

Comments are closed.