AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 129.06 Decreased By ▼ -0.47 (-0.36%)
BOP 6.75 Increased By ▲ 0.07 (1.05%)
CNERGY 4.49 Decreased By ▼ -0.14 (-3.02%)
DCL 8.55 Decreased By ▼ -0.39 (-4.36%)
DFML 40.82 Decreased By ▼ -0.87 (-2.09%)
DGKC 80.96 Decreased By ▼ -2.81 (-3.35%)
FCCL 32.77 No Change ▼ 0.00 (0%)
FFBL 74.43 Decreased By ▼ -1.04 (-1.38%)
FFL 11.74 Increased By ▲ 0.27 (2.35%)
HUBC 109.58 Decreased By ▼ -0.97 (-0.88%)
HUMNL 13.75 Decreased By ▼ -0.81 (-5.56%)
KEL 5.31 Decreased By ▼ -0.08 (-1.48%)
KOSM 7.72 Decreased By ▼ -0.68 (-8.1%)
MLCF 38.60 Decreased By ▼ -1.19 (-2.99%)
NBP 63.51 Increased By ▲ 3.22 (5.34%)
OGDC 194.69 Decreased By ▼ -4.97 (-2.49%)
PAEL 25.71 Decreased By ▼ -0.94 (-3.53%)
PIBTL 7.39 Decreased By ▼ -0.27 (-3.52%)
PPL 155.45 Decreased By ▼ -2.47 (-1.56%)
PRL 25.79 Decreased By ▼ -0.94 (-3.52%)
PTC 17.50 Decreased By ▼ -0.96 (-5.2%)
SEARL 78.65 Decreased By ▼ -3.79 (-4.6%)
TELE 7.86 Decreased By ▼ -0.45 (-5.42%)
TOMCL 33.73 Decreased By ▼ -0.78 (-2.26%)
TPLP 8.40 Decreased By ▼ -0.66 (-7.28%)
TREET 16.27 Decreased By ▼ -1.20 (-6.87%)
TRG 58.22 Decreased By ▼ -3.10 (-5.06%)
UNITY 27.49 Increased By ▲ 0.06 (0.22%)
WTL 1.39 Increased By ▲ 0.01 (0.72%)
BR100 10,445 Increased By 38.5 (0.37%)
BR30 31,189 Decreased By -523.9 (-1.65%)
KSE100 97,798 Increased By 469.8 (0.48%)
KSE30 30,481 Increased By 288.3 (0.95%)

The Indus River System Authority (IRSA) has appreciated the Pakistan Water and Power Development Authority (WAPDA) for demonstrating its skills and expertise yet again for filling of Tarbela Reservoir up to its maximum conservation level this year too. IRSA Chairman Sher Zaman Khan acknowledged the performance of Tarbela Dam Project authorities in a letter written to WAPDA Chairman, Lieutenant General Muzammil Hussain (Retd).

The letter states "I am compelled to acknowledge the outstanding performance as well as remarkable acumen, Tarbela Dam Authorities demonstrated in the filling of the Tarbela Reservoir to its Maximum Conservation Level during the ongoing Kharif Season 2019. IRSA was kept on board during the season especially on planning and better analysis of forecasting ensuring timely filling of the Dam without passing flood downstream." The letter further narrates "Although WAPDA's abilities are time tested, yet, in the multifaceted and challenging situation of operationalising Power Houses and filling of the reservoir, the skill was once again proven without a doubt."

Tarbela Dam is considered to be an iconic project for the contribution as it has made towards the development of Pakistan since 1974 by releasing the stored water for agriculture, mitigating floods and providing low-cost hydel electricity to the national grid. At the time of construction, Tarbela Reservoir had a live water storage capacity of 9.62 million acre-feet (MAF), however, it has reduced to 6.049 MAF because of the natural phenomenon of sedimentation. The installed capacity of Tarbela Hydel Power Station now stands at 4888 megawatts (MW) with completion of Tarbela 4th Extension Hydropower Project.

Copyright Business Recorder, 2019

Comments

Comments are closed.