AGL 38.00 Increased By ▲ 0.01 (0.03%)
AIRLINK 210.38 Decreased By ▼ -5.15 (-2.39%)
BOP 9.48 Decreased By ▼ -0.32 (-3.27%)
CNERGY 6.48 Decreased By ▼ -0.31 (-4.57%)
DCL 8.96 Decreased By ▼ -0.21 (-2.29%)
DFML 38.37 Decreased By ▼ -0.59 (-1.51%)
DGKC 96.92 Decreased By ▼ -3.33 (-3.32%)
FCCL 36.40 Decreased By ▼ -0.30 (-0.82%)
FFBL 88.94 No Change ▼ 0.00 (0%)
FFL 14.95 Increased By ▲ 0.46 (3.17%)
HUBC 130.69 Decreased By ▼ -3.44 (-2.56%)
HUMNL 13.29 Decreased By ▼ -0.34 (-2.49%)
KEL 5.50 Decreased By ▼ -0.19 (-3.34%)
KOSM 6.93 Decreased By ▼ -0.39 (-5.33%)
MLCF 44.78 Decreased By ▼ -1.09 (-2.38%)
NBP 59.07 Decreased By ▼ -2.21 (-3.61%)
OGDC 230.13 Decreased By ▼ -2.46 (-1.06%)
PAEL 39.29 Decreased By ▼ -1.44 (-3.54%)
PIBTL 8.31 Decreased By ▼ -0.27 (-3.15%)
PPL 200.35 Decreased By ▼ -2.99 (-1.47%)
PRL 38.88 Decreased By ▼ -1.93 (-4.73%)
PTC 26.88 Decreased By ▼ -1.43 (-5.05%)
SEARL 103.63 Decreased By ▼ -4.88 (-4.5%)
TELE 8.45 Decreased By ▼ -0.29 (-3.32%)
TOMCL 35.25 Decreased By ▼ -0.58 (-1.62%)
TPLP 13.52 Decreased By ▼ -0.32 (-2.31%)
TREET 25.01 Increased By ▲ 0.63 (2.58%)
TRG 64.12 Increased By ▲ 2.97 (4.86%)
UNITY 34.52 Decreased By ▼ -0.32 (-0.92%)
WTL 1.78 Increased By ▲ 0.06 (3.49%)
BR100 12,096 Decreased By -150 (-1.22%)
BR30 37,715 Decreased By -670.4 (-1.75%)
KSE100 112,415 Decreased By -1509.6 (-1.33%)
KSE30 35,508 Decreased By -535.7 (-1.49%)

The Indus River System Authority (IRSA) has appreciated the Pakistan Water and Power Development Authority (WAPDA) for demonstrating its skills and expertise yet again for filling of Tarbela Reservoir up to its maximum conservation level this year too. IRSA Chairman Sher Zaman Khan acknowledged the performance of Tarbela Dam Project authorities in a letter written to WAPDA Chairman, Lieutenant General Muzammil Hussain (Retd).

The letter states "I am compelled to acknowledge the outstanding performance as well as remarkable acumen, Tarbela Dam Authorities demonstrated in the filling of the Tarbela Reservoir to its Maximum Conservation Level during the ongoing Kharif Season 2019. IRSA was kept on board during the season especially on planning and better analysis of forecasting ensuring timely filling of the Dam without passing flood downstream." The letter further narrates "Although WAPDA's abilities are time tested, yet, in the multifaceted and challenging situation of operationalising Power Houses and filling of the reservoir, the skill was once again proven without a doubt."

Tarbela Dam is considered to be an iconic project for the contribution as it has made towards the development of Pakistan since 1974 by releasing the stored water for agriculture, mitigating floods and providing low-cost hydel electricity to the national grid. At the time of construction, Tarbela Reservoir had a live water storage capacity of 9.62 million acre-feet (MAF), however, it has reduced to 6.049 MAF because of the natural phenomenon of sedimentation. The installed capacity of Tarbela Hydel Power Station now stands at 4888 megawatts (MW) with completion of Tarbela 4th Extension Hydropower Project.

Copyright Business Recorder, 2019

Comments

Comments are closed.