AIRLINK 209.55 Decreased By ▼ -1.42 (-0.67%)
BOP 10.46 Decreased By ▼ -0.21 (-1.97%)
CNERGY 7.35 Decreased By ▼ -0.06 (-0.81%)
FCCL 34.39 Increased By ▲ 0.82 (2.44%)
FFL 18.05 Decreased By ▼ -0.36 (-1.96%)
FLYNG 22.92 Decreased By ▼ -0.70 (-2.96%)
HUBC 132.49 Increased By ▲ 1.10 (0.84%)
HUMNL 14.14 Increased By ▲ 0.04 (0.28%)
KEL 5.03 Increased By ▲ 0.05 (1%)
KOSM 7.07 Decreased By ▼ -0.09 (-1.26%)
MLCF 45.20 Increased By ▲ 1.44 (3.29%)
OGDC 218.38 Increased By ▲ 4.82 (2.26%)
PACE 7.58 Increased By ▲ 0.13 (1.74%)
PAEL 41.70 Increased By ▲ 0.17 (0.41%)
PIAHCLA 17.30 Decreased By ▼ -0.17 (-0.97%)
PIBTL 8.55 Decreased By ▼ -0.05 (-0.58%)
POWERPS 12.50 No Change ▼ 0.00 (0%)
PPL 189.03 Decreased By ▼ -0.57 (-0.3%)
PRL 42.33 Decreased By ▼ -1.98 (-4.47%)
PTC 25.17 Increased By ▲ 0.20 (0.8%)
SEARL 103.96 Increased By ▲ 0.59 (0.57%)
SILK 1.03 No Change ▼ 0.00 (0%)
SSGC 39.24 Decreased By ▼ -1.26 (-3.11%)
SYM 19.16 Decreased By ▼ -0.36 (-1.84%)
TELE 9.24 Decreased By ▼ -0.20 (-2.12%)
TPLP 13.10 Decreased By ▼ -0.40 (-2.96%)
TRG 69.18 Increased By ▲ 4.71 (7.31%)
WAVESAPP 10.72 Decreased By ▼ -0.18 (-1.65%)
WTL 1.71 Increased By ▲ 0.06 (3.64%)
YOUW 4.14 Decreased By ▼ -0.07 (-1.66%)
BR100 12,079 Decreased By -111.6 (-0.92%)
BR30 36,602 Increased By 19.8 (0.05%)
KSE100 116,053 Decreased By -202.4 (-0.17%)
KSE30 36,578 Decreased By -25.8 (-0.07%)
Print Print 2019-10-29

Audit raps French energy giant EDF over nuclear project

An official report rapped French energy giant EDF on the knuckles Monday for lacking a "culture of quality," as reflected in huge delays and price overruns at a nuclear plant it has been building for more than a decade. The report was presented to EDF's l
Published October 29, 2019

An official report rapped French energy giant EDF on the knuckles Monday for lacking a "culture of quality," as reflected in huge delays and price overruns at a nuclear plant it has been building for more than a decade. The report was presented to EDF's largest shareholder, the French government, which called for an urgent "plan of action" to improve standards at the company and get the much-needed plant online.

The delays at the Flamanville site in northern France come on top of a massive cost overrun at the Hinkley Point nuclear project EDF is building in Britain and a decade-long delay to the Olkiluoto plant in Finland. EDF's European Pressurised Reactor (EPR) reactor in Flamanville is now seven years late and costs have more than tripled to 12.4 billion euros ($13.7 billion). Earlier this month, the company said fixing faulty welding on the Flamanville reactor will add 1.5 billion euros ($1.6 billion) to the already swollen price tag.

Copyright Agence France-Presse, 2019

Comments

Comments are closed.