AGL 40.00 No Change ▼ 0.00 (0%)
AIRLINK 127.04 No Change ▼ 0.00 (0%)
BOP 6.67 No Change ▼ 0.00 (0%)
CNERGY 4.51 No Change ▼ 0.00 (0%)
DCL 8.55 No Change ▼ 0.00 (0%)
DFML 41.44 No Change ▼ 0.00 (0%)
DGKC 86.85 No Change ▼ 0.00 (0%)
FCCL 32.28 No Change ▼ 0.00 (0%)
FFBL 64.80 No Change ▼ 0.00 (0%)
FFL 10.25 No Change ▼ 0.00 (0%)
HUBC 109.57 No Change ▼ 0.00 (0%)
HUMNL 14.68 No Change ▼ 0.00 (0%)
KEL 5.05 No Change ▼ 0.00 (0%)
KOSM 7.46 No Change ▼ 0.00 (0%)
MLCF 41.38 No Change ▼ 0.00 (0%)
NBP 60.41 No Change ▼ 0.00 (0%)
OGDC 190.10 No Change ▼ 0.00 (0%)
PAEL 27.83 No Change ▼ 0.00 (0%)
PIBTL 7.83 No Change ▼ 0.00 (0%)
PPL 150.06 No Change ▼ 0.00 (0%)
PRL 26.88 No Change ▼ 0.00 (0%)
PTC 16.07 No Change ▼ 0.00 (0%)
SEARL 86.00 No Change ▼ 0.00 (0%)
TELE 7.71 No Change ▼ 0.00 (0%)
TOMCL 35.41 No Change ▼ 0.00 (0%)
TPLP 8.12 No Change ▼ 0.00 (0%)
TREET 16.41 No Change ▼ 0.00 (0%)
TRG 53.29 No Change ▼ 0.00 (0%)
UNITY 26.16 No Change ▼ 0.00 (0%)
WTL 1.26 No Change ▼ 0.00 (0%)
BR100 10,010 Increased By 126.5 (1.28%)
BR30 31,023 Increased By 422.5 (1.38%)
KSE100 94,192 Increased By 836.5 (0.9%)
KSE30 29,201 Increased By 270.2 (0.93%)

National Engineering Services Pakistan (NESPAK) Private Limited has won project design, construction supervision and implementation support of the ADB-funded Balochistan Water Resources Development Sector Project (BWRDSP) through national competitive bidding; this was stated by Dr. Tahir Masood, Managing Director NESPAK here on Wednesday.

The project will support implementation of integrated water resources management policy of the Government of Balochistan. The policy provides a comprehensive framework for the province to address the issues of water management and development in the context of basin approach, with water harvesting, and groundwater recharging as an integral part of watershed management. The proposed project will address the issues of water management and will enhance agricultural production by construction of a dam (Siri Toi Dam) and rehabilitation/extension of 10 irrigation schemes in Zhob and Mula river basins.

The proposed project will construct and improve irrigation land of about 16,592 hectares and benefit about 42,900 farmers in the Balochistan province. The duration of the project is five years.

Meanwhile, a NESPAK-8.2 OZI JV was awarded NTDC's contract for "Solar Water Pumping in Balochistan - A Feasibility Study." As an initiative towards energy and agricultural sectors reforms in Balochistan, NTDC on behalf of Ministry of Energy (Power Division) has entrusted NESPAK led JV with the task to conduct a comprehensive feasibility study for Solarization of 10,000 tube wells located in various Districts of Balochistan. The 5-month study will encompass a number of issues related to Balochistan endangering the sustainability of its eco-system.

Copyright Business Recorder, 2019

Comments

Comments are closed.